Irradiance Monitoring for Bifacial PV Systems’ Performance and Capacity Testing
Not Available
Engineering topics
Publications and source records attributed to Suez, Itai.
Not Available
This presentation discusses why we measure irradiance, what makes bifacial irradiance challenging, recommendations for monitoring rear POA irradiance, and a field comparison study.
Cyclical testing of electrically conductive bonding (ECB) is provided. Cyclical testing comprises high current flows using multiples of max operating currents and monitoring sensors with periods of no current to accelerate testing of electrical connections employing ECBs.
The advent of bifacial PV systems drives new requirements for irradiance measurement at PV projects for monitoring and assessment purposes. While there are several approaches, there is still no uniform guidance for what irradiance parameters to measure and for the optimal selection and placement of irradiance sensors at bifacial arrays. Standards are emerging to address these topics but are not yet available. In this paper we review approaches to bifacial irradiance monitoring which are being discussed in the research literature and pursued in early systems, to provide a preliminary guide and framework for developers planning bifacial projects.
The advent of bifacial PV systems drives new requirements for irradiance measurement at PV projects for monitoring and assessment purposes. While there are several approaches, there is still no uniform guidance for what irradiance parameters to measure and for the optimal selection and placement of irradiance sensors at bifacial arrays. Standards are emerging to address these topics but are not yet available. In this paper we review approaches to bifacial irradiance monitoring which are being discussed in the research literature and pursued in early systems, to provide a preliminary guide and framework for developers planning bifacial projects.