Rapid Development of the Seeker Free-Flying Inspector Guidance, Navigation, and Control System

Seeker is an automated extravehicular free-flying inspector CubeSat designed and built in-house at the Johnson Space Center (JSC). As a Class 1E project funded by the International Space Station (ISS) Program, Seeker had a streamlined process to flight certification, but the vehicle had to be designed, developed, tested, and delivered within approximately one year after authority to pro-ceed (ATP) and within a $1.8 million budget. These constraints necessitated an expedited Guidance, Navigation, and Control (GNC) development schedule, development began with a navigation sensor trade study using Linear Covariance (LinCov) analysis and a rapid sensor downselection process, resulting in the use of commercial off-the-shelf (COTS) sensors which could be procured quickly and subjected to in-house environmental testing to qualify them for flight. A neural network was used to enable a COTS camera to provide bearing measurements for visual navigation. The GNC flight software (FSW) algorithms utilized lean development practices and leveraged the Core Flight Software (CFS) architecture to rapidly develop the GNC system, tune the system parameters, and verify performance in simulation. This pace was anchored by several Hardware-Software Integration (HSI) milestones, which forced the Seeker GNC team to develop the interfaces both between hardware and software and between the GNC domains early in the project and to enable a timely delivery.

Sullivan, Jacob↗

Seeker Free-Flying Inspector GNC System Overview

Seeker is an ultra-low cost approach to highly automated extravehicular inspection of crewed or uncrewed spacecraft that has been designed and built in-house at the NASA Johnson Space Center (JSC). The first version of Seeker is intended to be an incremental development towards an advanced inspection capability. This effort builds on past free-flying inspector development efforts such as the Autonomous Extravehicular Activity Robotic Camera Sprint (AERCam Sprint) and Mini AERCam. Seeker was funded as an International Space Station (ISS) "X-by" Project, which required delivery of the vehicle approximately one year after authority to proceed and within the budget of $1.8 million. Seeker will fly onboard the NG-11 Cygnus mission in 2019 and will deploy after Cygnus' primary mission is completed. Seeker will perform inspection-like maneuvers within 50 meters of the target vehicle (Cygnus) and then dispose itself. The Seeker Guidance, Navigation, and Control (GNC) system is composed entirely of commercial off-the-shelf (COTS) and space-rated COTS items, an inertial-relative Multiplicative Extended Kalman Filter (MEKF), point-to-point guidance (with various additional modes such as stationkeeping), proportional-integral translational control, phase plane rotational control, and a state machine for automated mission moding with minimal ground input.

Navigation↗

Approach-Phase Precision Landing with Hazard Relative Navigation: Terrestrial Test Campaign Results of the Morpheus/ALHAT Project

The Morpheus Project began in late 2009 as an ambitious e ort code-named Project M to integrate three ongoing multi-center NASA technology developments: humanoid robotics, liquid oxygen/liquid methane (LOX/LCH4) propulsion and Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) into a single engineering demonstration mission to be own to the Moon by 2013. The humanoid robot e ort was redirected to a deploy- ment of Robonaut 2 on the International Space Station in February of 2011 while Morpheus continued as a terrestrial eld test project integrating the existing ALHAT Project's tech- nologies into a sub-orbital ight system using the world's rst LOX/LCH4 main propulsion and reaction control system fed from the same blowdown tanks. A series of 33 tethered tests with the Morpheus 1.0 vehicle and Morpheus 1.5 vehicle were conducted from April 2011 - December 2013 before successful, sustained free ights with the primary Vertical Testbed (VTB) navigation con guration began with Free Flight 3 on December 10, 2013. Over the course of the following 12 free ights and 3 tethered ights, components of the ALHAT navigation system were integrated into the Morpheus vehicle, operations, and ight control loop. The ALHAT navigation system was integrated and run concurrently with the VTB navigation system as a reference and fail-safe option in ight (see touchdown position esti- mate comparisons in Fig. 1). Flight testing completed with Free Flight 15 on December 15, 2014 with a completely autonomous Hazard Detection and Avoidance (HDA), integration of surface relative and Hazard Relative Navigation (HRN) measurements into the onboard dual-state inertial estimator Kalman lter software, and landing within 2 meters of the VTB GPS-based navigation solution at the safe landing site target. This paper describes the Mor- pheus joint VTB/ALHAT navigation architecture, the sensors utilized during the terrestrial ight campaign, issues resolved during testing, and the navigation results from the ight tests.

Crain, Timothy P.↗