Search NASASearch

Engineering topics

Sumrall, Phil

Publications and source records attributed to Sumrall, Phil.

23 records · Page 2

Summary of Propulsion System Needs in Support of Project Constellation

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to return man to the moon and ultimately to extend manned space travel to Mars. This paper will summarize the manned space flight liquid propulsion system needs in support of Project Constellation over the next 10 years. It will include all engine needs to return man to the moon. An overview of engines currently under contract, those baselined but not yet under contract, and those engine needs that hav.e yet to be initiated. Project Constellation includes the components as shown Figure 1. Liquid propulsion systems supporting the manned portion of these elements include the following: the Crew Exploration Vehicle named Orion (crew module reaction control system (CMRCS), service module Orion Main Engine (OME), service module auxiliary RCS, and service module reaction control system (SMRCS)), the Crew Launch Vehicle named Ares 1 (J2X upper stage, first stage roll control system, second stage reaction control system, and the Ares I-X roll control system), the Heavy Lift Launch Vehicle named Ares V (RS68B first stage booster, J-2X upper stage, roll control systems, and the Earth Departure Stage (EDS) (powered by the same Ares V Upper Stage J-2X), and the Lunar Lander named Altair with both descent and ascent stages (lunar orbit insertion and descent main engine, ascent main engine, and attitude control systems for both stages). In addition, there may be additional engine needs for early demonstrators, but those will not be speculated on as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort demonstrations and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned precursor missions.

Sumrall, Phil

Future X Pathfinder: Quick, Low Cost Flight Testing for Tomorrow's Launch Vehicles

The DC-X and DC-XA Single Stage Technology flight program demonstrated the value of low cost rapid prototyping and flight testing of launch vehicle technology testbeds. NASA is continuing this important legacy through a program referred to as Future-X Pathfinder. This program is designed to field flight vehicle projects that cost around $100M each, with a new vehicle flying about every two years. Each vehicle project will develop and extensively flight test a launch vehicle technology testbed that will advance the state of the art in technologies directly relevant to future space transportation systems. There are currently two experimental, or "X" vehicle projects in the Pathfinder program, with additional projects expected to follow in the near future. The first Pathfinder project is X-34. X-34 is a suborbital rocket plane capable of flights to Mach 8 and 75 kilometers altitude. There are a number of reusable launch vehicle technologies embedded in the X-34 vehicle design, such as composite structures and propellant tanks, and advanced reusable thermal protection systems. In addition, X-34 is designed to carry experiments applicable to both the launch vehicle and hypersonic aeronautics community. X-34 is scheduled to fly later this year. The second Pathfinder project is the X-37. X-37 is an orbital space plane that is carried into orbit either by the Space Shuttle or by an expendable launch vehicle. X-37 provides NASA access to the orbital and orbital reentry flight regimes with an experimental testbed vehicle. The vehicle will expose embedded and carry-on advanced space transportation technologies to the extreme environments of orbit and reentry. Early atmospheric approach and landing tests of an unpowered version of the X-37 will begin next year, with orbital flights beginning in late 2001. Future-X Pathfinder is charting a course for the future with its growing fleet of low-cost X- vehicles. X-34 and X-37 are leading the assault on high launch costs and enabling the flight testing of technologies that will lead to affordable access to space.

London, John, III

Overview of Mars transportation options and issues

The transportation options for manned Mars missions being considered for the Space Exploration Initiative are discussed. Seven candidate architectures are examined and compared: cryogenic/aerobraking, nuclear-electric propulsion, solar electric propulsion, nuclear rocket propulsion, L-based cryogenic/aerobraking, direct cryogenic/aerobraking, and cycler orbits. The rationales for choosing each one are presented, and cost considerations are addressed.

Adams, Alan

An infrastructure assessment of alternative Mars Transfer Vehicles

Development and evolutionary paths for many space transportation elements must be considered as the United States space program embarks on the Space Exploration Initiative (SEI). A central element of the space transportation infrastructure necessary to support the SEI is Mars Transportation System (MTS). This system consists of the Mars Transfer Vehicle (MTV) and Mars Excursion Vehicle. This paper describes the process and results in evaluating the alternate MTV propulsion concepts. Primary discriminators in evaluating different options for the MTV alternatives are: requirements for earth-to-orbit delivery, on-orbit facility and assembly requirements, and mission performance. Propulsion candidates assessed in this paper include nuclear thermal propulsion, nuclear electric propulsion, solar electric propulsion, and cryogenic chemical propulsion (LO2/LH2). The primary discriminators as well as additional selection criteria will be discussed for each MTS alternative.

Holdridge, Jeffrey D.

Infrastructure considerations

An evaluation is made of performance requirements and technology development prospects for the logistical capacity entailed by manned space exploration. While the Space Shuttle will suffice for the launch of crews to a LEO Space Station, in support of such exploration missions, cargo transport will require 500-1000 tonne annual payload capacity launchers. As a first step toward satisfaction of such requirements, NASA has undertaken the development of the Shuttle-C unmanned Space Shuttle derivative. This will be followed by the Shuttle-Z derivative-family, aimed at meeting the needs of Mars missions. Joint USAF/NASA Advanced Launch System development will allow a given launch to place 91 tonnes in LEO.

Lovelace, Uriel