Search NASA⌕ Search

Engineering topics

Suzuki, Kazuhiro

Publications and source records attributed to Suzuki, Kazuhiro.

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 129: Perspectives (US and Non-US) on the Use of Risk and Dose Assessment Tools (R9.3)

This panel focused on various dose and risk assessment tools for assessments, Deactivation and Decommissioning, remediation, and closure of sites of chemical and radioactive wastes. Representatives from the US government agencies, non-US countries and their representative regulatory bodies or authorities, as well as performance/risk assessment practitioners compared and contrasted the various guidance from regulatory agencies and authorities on how tools such as the Preliminary Remediation Goals (PRG) calculator, the Dose Compliance Concentrations (DCC) calculator, and Residual Radioactivity (RESRAD) should be used in support of analyses and decisions for environmental cleanup activities. Panelists with presentations: Cumulative Impact Evaluation: Innovative Tools for Evaluation of Groundwater Protection (Alaa Aly); Superfund Evaluation Process for Alternative Risk and Dose Models (with Focus on EPA and DOE Tools) (Stuart Walker); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 53: Japan Fukushima Daiichi Decommissioning Update (1/2)

This panel focused on up-dating the activities at Fukushima Daiichi. Panelists include Japanese representatives from Tokyo Electric Power Company Holdings, Inc. (TEPCO) and invited US Institute specialists. Presentations proposed include: 1 - Fukushima Daiichi Decontamination and Decommissioning: Current Status and Challenges (Akira Ono, TEPCO Holdings (Japan)); 2 - SRNL Engagement in Japan Recovery: From Clean-up to Decommissioning and Reclamation (Andrew Fellinger, Savannah River National Laboratory (USA)); 3 - Fukushima Daiichi Decommissioning Progress (Adrian Simper, Nuclear Decommissioning Authority UK (United Kingdom)); 4 - Stable Storage of Secondary Waste from Contaminated Water Treatment in Fukushima Daiichi (Kosuke Sato, Tokyo Electric Power Company Holdings, Inc. (Japan))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 54: Robotics/Remote Control Technology at Japan Fukushima Daiichi (2/2)

The panel focused on Robotics/Remote Control Technology considered and implemented at the Japan Fukushima Daiichi nuclear power plant and the surrounding clean-up efforts. Suzuki san recognized that a significant amount of progress had been made during the 8 years since that accident, and that a key component of the progress includes the development and application of robotic technologies. Presentations proposed include: 1 - Development of Robotics technologies in Hitachi-GE (Satoshi Okada, Hitachi-GE Nuclear Energy, Ltd. (Japan)); 2 - Remote Control Technology for Fuel Removal of Fukushima Daiichi Nuclear Power Plant Unit 3 (Shinya Okada, Kajima Cooperation (Japan)); 3 - VNS Fukushima Remote Handling (Matthew Cole, Veolia Nuclear Solutions (USA)); 4 - Education of the Robotics/Remote Technology for Decommissioning (Mio Kasai, National Institute of Technology, Fukushima College (Japan))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel reports session

This section brings together the reports of the 31 panel sessions listed below: - Avoiding the Human Capital Cliff in the DOE (PS22); - Implementing Technically-Based Cleanup; US DOE Balancing Regulatory and Fiscal Complexity (PS24); - United Kingdom - Remediation of Sellafield Legacy Ponds and Silos (PS25); - Aligning Decision-Making to Deliver Timely Results in Large Clean-up Programs (PS38); - Transition to Government Owned-Contractor Operated Site at Canadian Nuclear Laboratories (PS39); - Emerging Middle East Nuclear States' Status and Plans (PS40); - NPP Panel on Waste Management (PS41); - Robotics - International Innovations in Robotic Decommissioning Technology (PS43); - Fukushima Panel (1/2): Japan Fukushima Daiichi Decommissioning Update (PS54); - Fukushima Panel (2/2): Update on the Revitalization of Fukushima and the Surrounding Area (PS55); - US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process (PS56); - Challenges in DOE HLW Tank Management: Facility Start-up and Waste Disposition (PS57); - Waste Management Planning for Utility Small Modular Reactors (PS58); - US Nuclear Power Plant Waste Management - LLW Disposal Issues (PS59); - DOE-EM Robotics and Emerging Technologies Road-map (4/8) (PS60); - Graduating Students and New Scientists and Engineers - Wants and Needs - Are Companies Even Listening? (PS63); - U.S. Nuclear Robotics: Yesterday, Today, Tomorrow (5/8) (PS74); - US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes (PS76); - Current and Emerging US NRC LLW Regulatory Topics (PS77); - Agency Perspectives (US and International) on the Use of Risk and Dose Assessment Tools (PS80); - Progress on Deep Repository Programs Around the World (PS81); - US DOE Procurement and Contracting Opportunities (PS82); - Collaboration across Borders to Deliver Cleanup and Decommissioning Challenges (PS93a); - DOE Mission Success through Application of Practices and Solutions (PS94); - Challenges in Cask Certification - International Perspectives (PS96); - Robotics: Leveraging Innovations in Science and Technology to Benefit Safety Performance (PS98); - DOE Panel: DOE EM Featured Office - Portsmouth/Paducah Project Office (PS109); - Robotics: Lessons Learned from Industrial Robotics Deployment that can be Applied to the Nuclear Field (PS110a); - Roundtable: DOE Radioactive Management - Energy Facility Contractors Group - Waste Management Working Group (EFCOG WMWG) (PS118); - Thursday Topical Session 'Management of Used Nuclear Fuel: Will the United States Reengage and Align with International Efforts' (PS124); - Remotely Operated Vehicles for Emergency, Disaster, and Operational Upset Response (PS125)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hypertonicity-induced transmitter release at Drosophila neuromuscular junctions is partly mediated by integrins and cAMP/protein kinase A

The frequency of quantal transmitter release increases upon application of hypertonic solutions. This effect bypasses the Ca(2+) triggering step, but requires the presence of key molecules involved in vesicle fusion, and hence could be a useful tool for dissecting the molecular process of vesicle fusion. We have examined the hypertonicity response at neuromuscular junctions of Drosophila embryos in Ca(2+)-free saline. Relative to wild-type, the response induced by puff application of hypertonic solution was enhanced in a mutant, dunce, in which the cAMP level is elevated, or in wild-type embryos treated with forskolin, an activator of adenylyl cyclase, while protein kinase A (PKA) inhibitors decreased it. The response was also smaller in a mutant, DC0, which lacks the major subunit of PKA. Thus the cAMP/PKA cascade is involved in the hypertonicity response. Peptides containing the sequence Arg-Gly-Asp (RGD), which inhibit binding of integrins to natural ligands, reduced the response, whereas a peptide containing the non-binding sequence Arg-Gly-Glu (RGE) did not. A reduced response persisted in a mutant, myospheroid, which expresses no integrins, and the response in DC0 was unaffected by RGD peptides. These data indicate that there are at lease two components in the hypertonicity response: one that is integrin mediated and involves the cAMP/PKA cascade, and another that is not integrin mediated and does not involve the cAMP/PKA cascade.

NASA Discipline Cell Biology↗