Search NASA⌕ Search

Engineering topics

Svensson, L

Publications and source records attributed to Svensson, L.

Status of the 1 MeV Accelerator Design for ITER NBI

The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D{sup -} at 1 MeV for 3600 sec. In order to realize the beam source, design and R and D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co-extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.

43 PARTICLE ACCELERATORS↗

Design and Overview of 100 kV Bushing for the DNB Injector of ITER

The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

43 PARTICLE ACCELERATORS↗

RAMI Analyses of Heating Neutral Beam and Diagnostic Neutral Beam Systems for ITER

A RAMI (Reliability, Availability, Maintainability, Inspectability) analysis has been performed for the heating (and current drive) neutral beam (HNB) and diagnostic neutral beam (DNB) systems of the ITER device. The objective of these analyses is to implement RAMI engineering requirements for design and testing to prepare a reliability-centred plan for commissioning, operation, and maintenance of the system in the framework of technical risk control to support the overall ITER Project. These RAMI requirements will correspond to the RAMI targets for the ITER project and the compensating provisions to reach them as deduced from the necessary actions to decrease the risk level of the function failure modes. The RAMI analyses results have to match with the procurement plan of the systems.

43 PARTICLE ACCELERATORS↗

Aperture Size Effect on Extracted Negative Ion Current Density

This paper discusses experimental results obtained at the 1 MV testbed at CEA Cadarache that appear to show a higher extracted D{sup -} current density from small apertures. Plasma grids with different shapes have been installed and tested. All grids had one single aperture. The tests were done in volume operation and in caesium operation. We tested four grids, two with Oe14 mm, one with Oe11 mm and one with Oe8 mm apertures. No aperture size effect was observed in volume operation. In caesiated operation the extracted current density for the Oe8 mm aperture appears to be significantly higher ({approx}50%) than for the Oe14 mm aperture. Simulations with a 3D Monte Carlo Trajectory Following Code have shown an aperture size effect of about 20%. Finally, as byproducts of the experiments, data on backstreaming positive ions and the temperature of the plasma grid have been obtained.

43 PARTICLE ACCELERATORS↗

Development of 1 MeV H{sup -} Accelerator at JAEA for ITER NB

This paper reports the recent activities at JAEA for the development of 1 MeV H{sup -} ion accelerator toward the ITER NBI. For the development of MAMuG accelerator, a 320 mA H{sup -} ion beam was successfully accelerated as the highest record in the world at the MeV class energy (796 keV). This was achieved by protecting the H{sup -} ion source from the high heat load by the backstream positive ions, which was produced during the high current H{sup -} ion acceleration. The SINGAP accelerator was tested at JAEA to compare the performance of the SINGAP and the MAMuG. This paper also reports the results of the SINGAP test and the comparison between the SINGAP and the MAMuG is discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Results of the SINGAP Neutral Beam Accelerator Experiment at JAEA

IRFM (CEA Cadarache) and JAEA Naka have entered into a collaboration in order to test a SINGAP accelerator at the JAEA Megavolt Test Facility (MTF) at Naka, Japan. Whereas at the CEA testbed the acceleration current was limited to 0.1 A, at JAEA 0.5 A is available. This allows the acceleration of 15 H- beamlets in SINGAP to be tested and a direct comparison between SINGAP and MAMuG to be made. High-voltage conditioning in the SINGAP configuration has been quite slow, with 581 kV in vacuum achieved after 140 hours of conditioning. With 0.1 Pa of H2 gas present in the accelerator 787 kV could be achieved. The conditioning curve for MAMuG is 200 kV higher. SINGAP beam optics appears in agreement with calculation results. A beamlet divergence better than 5 mrad was obtained. SINGAP accelerates electrons to a higher energy than MAMuG. Measurements of the power intercepted on one of the electron dumps have been compared with EAMCC code calculations. Based on the experiments described here, electron production by a SINGAP accelerator scaled up to ITER size was estimated to be too high for comfort.

43 PARTICLE ACCELERATORS↗