Search NASA⌕ Search

Engineering topics

Svoboda, Josef

Publications and source records attributed to Svoboda, Josef.

Commissioning a time-gated camera for fast neutron beamline spatial-energy characterization at LANSCE-WNR spallation source

An energy-resolved fast neutron beam imaging diagnostic has been successfully commissioned at the Weapons Neutron Research (WNR) spallation source within the Los Alamos Neutron Science Center (LANSCE) facility. This diagnostic replaces the existing analog phosphor image plates, which integrate across all neutron energies, as well as other particles, with a near-real-time energy-sensitive imaging capability. The system uses a fast plastic scintillator coupled with an intensified CCD camera. Specifically, the Teledyne Pi-MAX4 camera is coupled with either a 4 mm thick Eljen (EJ) 204 or 228 plastic scintillator. These scintillators are most sensitive to the fast neutrons (0.8-800 MeV) directly from the spallation source rather than low energy background radiation. Experimentally, these plastic scintillators were shown to have sufficiently fast decay to differentiate the bright gamma flash from the spallation neutrons. The spatial resolution is dominated by neutron beam divergence, with minimal additional contributions from scatter and light divergence. The system successfully resolved changes in neutron beam characteristics caused by intentional proton steering variations. Additionally, simulations of scintillator light yield as a function of thickness conducted using PHITS (with Scinful-QMD package) found that increasing scintillator thickness from 4 mm to 6 or 8 mm could potentially increase brightness ~ 3x. This may be explored if there is a need to reduce image acquisition time from several minutes to under one minute.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Background simulations for DANCE, FP-14 considering the Mark IV spallation target

With the installation of the Mark-IV target at LANSCE in 2022 significant changes of the beam-related backgrounds at DANCE are observed. DANCE is located at flight path 14 (FP-14) in the experimental area 2 (ER-2) at LANSCE. This new background is so severe that the array is not operational for several microseconds after the protons hit the spallation target (Figures 1 - 3).

43 PARTICLE ACCELERATORS↗

Report on the DANCE/FP14 Beam Profile and plans for the CY23 LANSCE run cycle

During the beam outage at the beginning of calendar year 2022, the Lujan Center Spallation Target was replaced with the Mark-IV design. Most notably, this included a rotated tungsten disk (for neutron production) in the direct line of sight of the upper tier flight-paths (FPs 12-15), which include DANCE, DICER, and the general-purpose flight path 12, all focused on nuclear physics measurements. This change was made in order to significantly improve both the neutron flux and the time-of-flight resolution for neutrons above 1 keV. Details of the design and motivation can be found in Zavorka et al. 2018. Due to the changes in the spallation target, significant work was required to provide new shutters and shielding for the upper tier flight paths. While the planned beam deliver was for September of 2022, because of delays in the installation process, first beam to DANCE was received the afternoon of 22 Nov 2022. Due to accelerator reliability issues, a total of only 18 days of beam were available for the run cycle. Approximately 90 days of development were planned for understanding the neutronic proper<es of the new spallation target. Most of this work could not be completed. Two measurements were completed, of which one will be discussed here.

43 PARTICLE ACCELERATORS↗