Search NASASearch

Engineering topics

Swieringa, Kurt

Publications and source records attributed to Swieringa, Kurt.

UAS Concept of Operations and Vehicle Technologies Demonstration

In 2017 and 2018, under National Aeronautics and Space Administration (NASA) sponsorship, the New York Unmanned Aircraft Systems (UAS) Test Site and Northeast UAS Airspace Integration Research (NUAIR) Alliance conducted a year-long research project that culminated in a UAS technology flight demonstration. The research project included the creation of a concept of operations, and development and demonstration of UAS technologies. The concept of operations was focused on an unmanned aircraft transiting from cruise through Class E airspace into a high-density urban terminal environment. The terminal environment in which the test was conducted was Griffiss International Airport, under Syracuse Air Traffic Control (ATC) approach control and Griffiss control tower. Employing an Aurora Centaur optionally piloted aircraft (OPA), this project explored six scenarios aimed at advancing UAS integration into the National Airspace System (NAS) under both nominal and off-nominal conditions. Off-nominal conditions were defined to include complete loss of the communications link between the remote pilot’s control station on the ground and the aircraft. The off-nominal scenarios that were investigated included lost-link conditions with and without link recovery, an automated ATC initiated go-around, autonomous rerouting around a dynamic airspace obstruction (in this case simulated weather), and autonomous taxi operations to clear the runway.

Swieringa, Kurt

Participant Training for a Flight Test Evaluation of Interval Management

Interval Management is a concept designed to be used by air traffic controllers and flight crews to more efficiently and precisely manage inter-aircraft spacing. NASA, in cooperation with Boeing, Honeywell, and United Airlines, tested an avionics prototype onboard flight test aircraft. A critical need was identified to train the pilots participating in the flight test prior to the first flight. This paper documents the flight training regimen that successfully trained the pilots on the Interval Management concepts and flight crew procedures and suggests potential improvements to future training regimens for industry use.

Roper, Roy

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Systems Integration and Operationalization (SIO) Demonstration

The UAS-NAS Project hosted a Systems Integration Operationalization (SIO) Industry Day for the SIO Request for Information (RFI) on November 30, 2017 in San Diego, California. This presentation is being presented to the same group as a follow up regarding the progress that the UAS-NAS project has made on the SIO RFI. The presentation will be virtual with a teleconference

outreach

Results from an Interval Management (IM) Flight Test and Its Potential Benefit to Air Traffic Management Operations

NASA's first Air Traffic Management Technology Demonstration (ATD-1) subproject successfully completed a 19-day flight test of an Interval Management (IM) avionics prototype. The prototype was built based on IM standards, integrated into two test aircraft, and then flown in real-world conditions to determine if the goals of improving aircraft efficiency and airport throughput during high-density arrival operations could be met. The ATD-1 concept of operation integrates advanced arrival scheduling, controller decision support tools, and the IM avionics to enable multiple time-based arrival streams into a high-density terminal airspace. IM contributes by calculating airspeeds that enable an aircraft to achieve a spacing interval behind the preceding aircraft. The IM avionics uses its data (route of flight, position, etc.) and Automatic Dependent Surveillance-Broadcast (ADS-B) state data from the Target aircraft to calculate this airspeed. The flight test demonstrated that the IM avionics prototype met the spacing accuracy design goal for three of the four IM operation types tested. The primary issue requiring attention for future IM work is the high rate of IM speed commands and speed reversals. In total, during this flight test, the IM avionics prototype showed significant promise in contributing to the goals of improving aircraft efficiency and airport throughput.

Baxley, Brian

Recommended Changes to Interval Management to Achieve Operational Implementation

A 19-day flight test of an Interval Management (IM) avionics prototype was conducted in Washington State using three aircraft to precisely achieve and maintain a spacing interval behind the preceding aircraft. NASA contracted with Boeing, Honeywell, and United Airlines to build this prototype, and then worked closely with them, the FAA, and other industry partners to test this prototype in flight. Four different IM operation types were investigated during this test in the en route, arrival, and final approach phases of flight. Many of the IM operations met or exceeded the design goals established prior to the test. However, there were issues discovered throughout the flight test, including the rate and magnitude of IM commanded speed changes and the difference between expected and actual aircraft deceleration rates.

Baxley, Brian

Wind Information Uplink to Aircraft Performing Interval Management Operations

The accuracy of the wind information used to generate trajectories for aircraft performing Interval Management (IM) operations is critical to the success of an IM operation. There are two main forms of uncertainty in the wind information used by the Flight Deck Interval Management (FIM) equipment. The first is the accuracy of the forecast modeling done by the weather provider. The second is that only a small subset of the forecast data can be uplinked to the aircraft for use by the FIM equipment, resulting in loss of additional information. This study focuses on what subset of forecast data, such as the number and location of the points where the wind is sampled should be made available to uplink to the aircraft.

Ahmad, Nashat

Evaluation of an Airborne Spacing Concept, On-Board Spacing Tool, and Pilot Interface

The number of commercial aircraft operations is predicted to increase in the next ten years, creating a need for improved operational efficiency. Two areas believed to offer significant increases in efficiency are optimized profile descents and dependent parallel runway operations. It is envisioned that during both of these types of operations, flight crews will precisely space their aircraft behind preceding aircraft at air traffic control assigned intervals to increase runway throughput and maximize the use of existing infrastructure. This paper describes a human-in-the-loop experiment designed to study the performance of an onboard spacing algorithm and pilots ratings of the usability and acceptability of an airborne spacing concept that supports dependent parallel arrivals. Pilot participants flew arrivals into the Dallas Fort-Worth terminal environment using one of three different simulators located at the National Aeronautics and Space Administration s (NASA) Langley Research Center. Scenarios were flown using Interval Management with Spacing (IM-S) and Required Time of Arrival (RTA) control methods during conditions of no error, error in the forecast wind, and offset (disturbance) to the arrival flow. Results indicate that pilots delivered their aircraft to the runway threshold within +/- 3.5 seconds of their assigned arrival time and reported that both the IM-S and RTA procedures were associated with low workload levels. In general, pilots found the IM-S concept, procedures, speeds, and interface acceptable; with 92% of pilots rating the procedures as complete and logical, 218 out of 240 responses agreeing that the IM-S speeds were acceptable, and 63% of pilots reporting that the displays were easy to understand and displayed in appropriate locations. The 22 (out of 240) responses, indicating that the commanded speeds were not acceptable and appropriate occurred during scenarios containing wind error and offset error. Concerns cited included the occurrence of multiple speed changes within a short time period, speed changes required within twenty miles of the runway, and an increase in airspeed followed shortly by a decrease in airspeed. Within this paper, appropriate design recommendations are provided, and the need for continued, iterative human-centered design is discussed.

Swieringa, Kurt