Search NASA⌕ Search

Engineering topics

Takahashi, Kenji

Publications and source records attributed to Takahashi, Kenji.

Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future

Most states today require regulated electric utilities to file an IRP every 1 to 5 years, and some utilities voluntarily prepare these plans. Planning needs have changed in recent years due to emerging load growth, plant retirements, rising costs, and more extreme weather events – among other factors. In response, Synapse Energy Economics and Lawrence Berkeley National Laboratory produced a joint report, Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future. The guide offers best planning practices for electricity systems undergoing a major transition, but also contains a wealth of practical guidance to develop technically sophisticated, clearer, more effective, and state-of-the-art electric utility resource plans. The guide is for resource planning professionals and stakeholders involved in resource planning processes. This diverse group includes utility personnel tasked with conducting resource planning and making investment decisions, state regulatory commissions that develop planning guidance and oversee the resource planning process, and stakeholders that represent a wide range of interests—utility consumer advocates, environmental groups, industrial customers, local governments, independent power producers, and many other

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗