Search NASA⌕ Search

Engineering topics

Tartakovsky, Guzel

Publications and source records attributed to Tartakovsky, Guzel.

Vadose Zone Model for LLBG-200W A for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a results of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-63 Area for Composite Analysis (Rev. 2)

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis Vadose Zone Transport of Selected Radionuclides Released from DOE O 435.1 Sources.

The main objectives of the composite analysis (CA) compliance case vadose zone (VZ) facet are to simulate transport of radionuclide releases from the surface to the water table, and to provide radionuclide transfer rates to groundwater for inclusion into the Plateau-to-River (P2R) saturated zone (SZ) model (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). The parallel exascale version of the Subsurface Transport Over Multiple Phases (eSTOMP1) simulator is used to simulate flow and transport for the CA VZ models. The CA compliance case approach to address the scale and distribution of contaminant sources in the VZ facet is to subdivide the Hanford Site Central Plateau into 26 models that contain contaminant sources and liquid discharges likely to commingle during migration through the VZ to the water table.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rapid Decision Support Tool for Estimating Impacts of a Vadose Zone Volatile Organic Compound Source on Groundwater and Soil Gas

Diminishing rates of subsurface volatile contaminant removal by soil vapor extraction (SVE) oftentimes warrants an in‐depth performance assessment to guide remedy decision‐making processes. Such a performance assessment must include quantitative approaches to better understand the impact of remaining vadose zone contamination on soil gas and groundwater concentrations. The spreadsheet‐based Soil Vapor Extraction Endstate Tool (SVEET) software functionality has recently been expanded to facilitate quantitative performance assessments. The updated version, referred to as SVEET2, includes expansion of the input parameter ranges for describing a site (site geometry, source characteristics, etc.), an expanded list of contaminants, and incorporation of elements of the Vapor Intrusion Estimation Tool for Unsaturated‐zone Sources software to provide soil gas concentration estimates for use in vapor intrusion evaluation. As part of the update, SVEET2 was used to estimate the impact of a tetrachloroethene (PCE) vadose zone source on groundwater concentrations, comparing SVEET2 results to field‐observed values at an undisclosed site where SVE was recently terminated. PCE concentrations from three separate monitoring wells were estimated by SVEET2 to be within the range of 6.0–6.7 μg/L, as compared to actual field concentrations that ranged from 3 to 11 μg/L PCE. These data demonstrate that SVEET2 can rapidly provide representative quantitative estimates of impacts from a vadose zone contaminant source at field sites. Finally, in the context of the SVE performance assessment, such quantitative estimates provide a basis to support remedial and/or regulatory decisions regarding the continued need for vadose zone volatile organic compound remediation or technical justification for SVE termination, which can significantly reduce the cost to complete for a site.

54 ENVIRONMENTAL SCIENCES↗

Vadose Zone Model for B-3 Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3 Pond vadose zone model. The B-3 Pond model covers the main lobe of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B Plant Area vadose zone model. The B Plant Area model encompasses the region around B Plant (221-B) in the western part of 200 East Area. The plant was used to separate plutonium from irradiated fuel using the bismuth-phosphate process from 1945 to 1956, and for strontium and cesium recovery from 1968 to 1985.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for S Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chloiine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thmium-230 (Th-230). The simulation time struts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases ( eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user's guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User 's Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3A/B Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain. The Hanford Site Central Plateau was subdivided into 26 individual vadose zone models, with 13 in the 200 East Area and 13 in the 200 West Area. Waste sites that have a completed performance assessment (PA) or past-leak analysis were not included as sources of radionuclides. Instead the vadose zone to groundwater transfer rates of the Environmental Restoration Disposal Facility, Integrated Disposal Facility, US Ecology, and Waste Management Area C (WMA C) PAs and the past-leak analysis for WMA C were used as direct input to the P2R model. Each of the vadose zone models is documented in separate environmental calculation files (ECFs). This ECF describes the B-3A/B Ponds model. The scope of this ECF is to document the development and results of the B-3 A/B Ponds vadose zone model. CP-63515, Model Package Report: Central Plateau Vadose Zone Models, describes the approach, assumptions, process of determining the number of models required and domain of each model, input data, and processing common to all the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Defining a Metric to Assess Leachability of Contaminants from Cementitious Waste Forms in Lab Testing Related to Hanford - 20478

This paper reports on the determination of performance metrics for the release of four contaminants (technetium, iodine, nitrate, and chromium) from a theoretical supplemental low-activity waste (LAW) inventory of grout in the Hanford Integrated Disposal Facility (IDF). The performance metric was defined as a retardation factor, R, that can be used to quantify a waste form's ability to retain one contaminant compared with an un-retarded species (e.g., sodium). By setting the target R value at the magnitude required to maintain concentrations of the contaminants below the drinking water standard at the point of compliance for the IDF, a bar for grout leach performance can be established for screening laboratory leach test data. The R can be converted to a corresponding laboratory-observed diffusivity value against which to assess leach test data. The individual performance metrics were determined through an iterative set of simulations using a variable saturation and transport flow model of a grout waste form inventory in the IDF to calculate the resulting concentration-based requirements at the point of compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physics-Informed CoKriging: A Gaussian-Process-Regression-Based Multifidelity Method for Data-Model Convergence

In this work, we propose a new Gaussian process regression (GPR)-based multifidelity method: physics-informed CoKriging (CoPhIK). In CoKriging-based multifidelity methods, the quantities of interest are modeled as linear combinations of multiple parameterized stationary Gaussian processes (GPs), and the hyperparameters of these GPs are estimated from data via optimization. In CoPhIK, we construct a GP representing low-fidelity data using physics-informed Kriging (PhIK), and model the discrepancy between low- and highfidelity data using a parameterized GP with hyperparameters identified via optimization. Our approach reduces the cost of optimization for inferring hyperparameters by incorporating partial physical knowledge. We prove that the physical constraints in the form of deterministic linear operators are satisfied up to an error bound. Furthermore, we combine CoPhIK with a greedy active learning algorithm for guiding the selection of additional observation locations. The eciency and accuracy of CoPhIK are demonstrated for reconstructing the partially observed modified Branin function, reconstructing the sparsely observed state of a steady state heat transport problem, and learning a conservative tracer distribution from sparse tracer concentration measurements.

Yang, Xiu↗