Search NASA⌕ Search

Engineering topics

Tate, Austin

Publications and source records attributed to Tate, Austin.

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

O-Plan2: The open planning architecture

The O-Plan2 Project at the Artificial Intelligence Applications Institute of the University of Edinburgh is exploring a practical computer based environment to provide for specification, generation, interaction with, and execution of activity plans. O-Plan2 is intended to be a domain-independent general planning and control framework with the ability to embed detailed knowledge of the domain. Various aspects of the project are presented.

Drabble, Brian↗

Coordinating the activities of a planner and an execution agent

A research program was defined that will explore the link between planning and execution systems. A simple scenario was defined in which a very capable off-line planning system interacts with the user and a smaller, less capable, on-line real-time system executing plans and reacting to faults. However, the on-line execution system may have a more flexible representation of the plans it is executing. This imbalance in the capabilities of the two agents involved should clarify some of the research objectives and give an experimental framework for the work. The task is to investigate the knowledge representations and communication protocols needed to link a user stating some requirements for a task to be carried out through a planning system to the (remote) execution agent that can carry out the user's wishes. The notion that a single representation can encapsulate the expression of the user's requirements, the capabilities for action, the communication to the execution agent, the successful or faulty response from the execution agent and the means of keeping the user informed, is examined. Methods of creating plan patches to update the plans separately held by each of the parties involved to keep them in step as they each react to changing circumstances in real-time is investigated. This involves the specification of plan patch attachment points that can be understood by the recipient. Transaction based methods are also investigated for coordinating the activities of the planner with those of the execution agent and user. The trial application area for the research is in the command and control of an advanced Earth Observation Space Platform.

Tate, Austin↗