Slider Crank WEC Performance Analysis with Adaptive Autoregressive Filtering

This paper investigates a performance analysis of wave excitation force prediction to extract wave power for a slider crank power take-off system (PTOS) based on auto regressive (AR) filters. To efficiently convert wave energy into electricity, the prediction of wave excitation forces to keep the generator and the wave excitation force in sync is important for maximum energy extraction. The study shows a prediction methodology of half period and zero crossings in the practical scenario of irregular ocean waves. The prediction has been tested for different wave periods and with different filter orders. The prediction results have been used in the PTOS simulation to analyze the energy extraction. It has been shown that the prediction accuracy in the wave half period between the truth data and the predicted data drives the WEC energy extraction efficiency. The amplitude of the wave force is not used and hence the prediction deviation in the wave force amplitude does not affect the PTOS energy extraction. Further analysis shows that the optimum energy can be extracted at 15 th order filter with moderate prediction horizon length.

autoregressive filter↗

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling↗