Search NASA⌕ Search

Engineering topics

Taylor, Micah S.

Publications and source records attributed to Taylor, Micah S..

NEPATEC2.0: NEPA Text Corpus v2.0

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

environmental review↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Linkages Between Mineral Element Composition of Soils and Sediments With Hyporheic Zone Dissolved Organic Matter Chemistry Across the Contiguous United States

The hyporheic zone is a hotspot for biogeochemical cycling where interactions with mineral metals preserve the release and biodegradation of organic matter (OM). A small fraction of OM can still be exchanged between localized sediments and the overlying water column, and recent evidence suggests there exists a longitudinal structuring in sediment dissolved OM (DOM) chemistry across the continental United States (CONUS). In this study, we tested a hypothesis that water extractable sediment DOM chemistry could be explained by sediment metal contents and integrative watershed scale features at the CONUS scale. Crowdsourced samples were characterized for high resolution mass spectrometry and coupled with sediment metals determined via x-ray fluorescence as well as with land cover and soil elemental information obtained from national databases. Our results highlight weak relationships between DOM chemistry and elemental composition at the CONUS scale indicating limited transferability of organo-metal linkages into multi-scale hydrobiogeochemical models.

58 GEOSCIENCES↗

Opportunities for Pumped Storage Hydropower under the Inflation Reduction Act [Slides]

The Inflation Reduction Act (IRA) creates significant incentives for clean energy technologies including pumped storage hydropower (PSH). The investment tax credit (ITC) is expected to sunset in 2033 (or later). This decade-long window of opportunity can accommodate the lead times typically necessary for developing PSH. The ITC for PSH likely ranges from 6%-50%. Portions of the ITC are spatially dependent. 22 states have the potential for deployment of PSH at a feasible site with the maximum ITC of 50%, based on currently defined areas under the energy community tax credit bonus. Regions including the central Rockies, Appalachia and the California-Nevada border have especially high combined potential for site feasibility and ITC.

13 HYDRO ENERGY↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗