Search NASA⌕ Search

Engineering topics

Telsang, Bhagyashri

Publications and source records attributed to Telsang, Bhagyashri.

Hierarchical Model-Free Transactive Control of Building Loads to Support Grid Services

Residential buildings consume 4.4 quads of electricity annually, approximately 37% of the total electricity consumption in the United States. This represents a vast resource that can be used for demand management and other ancillary services. This project aims to develop a robust, scalable hierarchical transactional control mechanism incorporating elements of model-free control (MFC) and game theory to harness buildings to provide ancillary services to the grid. This approach is being taken to address the challenges of incorporating traditional transactional control schemes into existing buildings. The challenges include small individual building sizes requiring aggregation of many buildings, unpredictable energy usage that makes model identification difficult, and satisfying the sensitive occupant comfort constraints. In the proposed approach, by separating the control mechanism into two layers above and below the load aggregator, MFC can be used below the aggregator to modulate flexible building loads in response to pricing signals with guaranteed performance. This allows the burden of identifying an accurate model of the system to be shifted to the above-aggregator layer, where fluctuations in individual building usage have less impact on predicted building system behavior. Game theory concepts can then be used to determine pricing curves and control signals among regional aggregators. Managing this control in a game-theoretic approach will allow us to build in financial incentives that increase customer engagement. Additionally, the usage of MFC necessitates less burdensome computational and communication requirements, thus, it is easily deployable on small, embedded devices. In a broader sense, developing a strategy capable of effectively incorporating residential and small commercial buildings will allow greater throughput of existing and emerging grid services in addition to future transactive energy grid management methods. Using MFC within a hierarchical control architecture will allow the shifting of existing forecasting challenges to an aggregate level, where dynamics are slower and more predictable. This will enable a smooth interface between the grid services requests of utilities and the reliable control required by participating buildings. MFC, which supports distributed control architecture, permits a scalable solution that can be deployed to neighborhood-size systems as well as individual buildings. This project focuses on three objectives: (1) developing the mathematical framework, algorithm toolkit, and software toolset of the two-layer transactive control testbed; (2) developing a scalable solution for application over many residential and small-size commercial buildings with sparse distributed communication; and (3) field testing and implementation on hardware of the control strategies developed in the previous two objectives. The research and development activities are focused and designed to be impactful within the relevant 2025 targets timeframe. An open-source control framework for exploiting variability and dispatchability of building loads will be delivered as the outcome of the project. This capability enables greater participation of loads in electricity markets and ancillary services that are both useful for the utility and financially beneficial for building owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Model-Free Building Temperature Control and Power Allocation Under Measurement Time Delays

Taking a step towards a greener planet has created an increased need for a higher integration of renewable energy resources into the electric grid. Nonetheless, the intermittency and uncertainty associated with renewable generation have slowed down this integration. Demand response (DR) has been recently adopted to address this challenge by utilizing demand side flexibility and enabling the participation of many grid-interactive efficient buildings (GEBs). However, existing DR methods require significant modeling and/or training efforts and are computationally expensive. To address the aforementioned issues, we propose a model-free control (MFC)-based strategy that is robust to the time delays in the temperature measurements of the thermostatically controlled loads (TCLs). It assigns to each GEB a local controller to maintain the TCLs’ temperatures within desired comfort levels, while the load aggregator (LA) allocates the assigned reference power provided by the distribution system operator (DSO) to support a specific grid service, such as demand peak reduction, load shifting, balancing supply and demand, and consuming the solar photovoltaic power locally. We investigate the effects of such loss of information on the local control action as well as on meeting the power allocation constraint. We conclude that, for an appropriate choice of design parameters, the proposed MFC controller is satisfactorily robust to measurement time delays.

Telsang, Bhagyashri↗

Stochastic Pricing Game for Aggregated Demand Response Considering Comfort Level

In recent years, demand response (DR) has been explored as a fundamental strategy for demand-side management due to its advantages in mediating intermittency of renewable energy generation, load shifting, etc. To engage customers in DR programs, several deterministic price-based DR strategies have been developed and implemented. However, the stochastic weather conditions and occupants' consumption behaviors often make the deterministic solution less robust to uncertainties. In this paper, with the consideration of the uncertainties, a stochastic Stackelberg game is proposed to model the price-demand negotiation between a distributed system operator and load aggregators, where the virtual battery constraints are extracted from the building thermostatically controlled loads (TCLs)‘ characteristics to guarantee comfortable TCLs' levels. Following the negotiation, a priority-based control method is used to allocate the optimal aggregated power DR profile at the building level and track the power signal. Several groups of experiments have demonstrated the effectiveness and robustness of the stochastic solutions.

Chen, Yang↗

Power allocation by load aggregator with heterogeneous loads using weighted projection

With the recently increasing adoption of transactive energy markets, the role of a load aggregator is becoming increasingly important. Among the many tasks of an aggregator, the task of managing the electricity consumption among a group of grid-interactive efficient buildings according to the demand on the grid is taken up. Specifically, here, the task of allocating a certain amount of power among the participating customers while respecting their preferences and comfort is considered. Modeling this as an aggregate flexibility, the virtual battery conditions that are employed to verify the feasibility of a candidate power profile are derived. A feasible power profile, when allocated, satisfies specified comfort bands. To determine the ideal power requirement of the loads, the model-free control method is employed. The feasible power profile is allocated by embedding the customers’ preferences through weights, posing the power constraint as a hyperplane, and employing a weighted projection from the ideal power requirements onto the constraint plane to solve the considered task. The proposed method is computationally efficient and scalable to any number of heterogeneous thermostatically controlled loads in buildings.

24 POWER TRANSMISSION AND DISTRIBUTION↗