Search NASASearch

Engineering topics

Texter, Scott

Publications and source records attributed to Texter, Scott.

JWST Pathfinder Telescope Integration

The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. In 2014, a major risk reduction effort related to the Alignment, Integration, and Test (AI&T) of the segmented telescope was completed. The Pathfinder telescope includes two Primary Mirror Segment Assemblies (PMSA's) and the Secondary Mirror Assembly (SMA) onto a flight-like composite telescope backplane. This pathfinder allowed the JWST team to assess the alignment process and to better understand the various error sources that need to be accommodated in the flight build. The successful completion of the Pathfinder Telescope provides a final integration roadmap for the flight operations that will start in August 2015.

JWST

James Webb Space Telescope Optical Telescope Element Mirror Development History and Results

In a little under a decade, the James Webb Space Telescope (JWST) program has designed, manufactured, assembled and tested 21 flight beryllium mirrors for the James Webb Space Telescope Optical Telescope Element. This paper will summarize the mirror development history starting with the selection of beryllium as the mirror material and ending with the final test results. It will provide an overview of the technological roadmap and schedules and the key challenges that were overcome. It will also provide a summary or the key tests that were performed and the results of these tests.

Feinber, Lee D.

Engineering Design Unit Primary Mirror Segment

The James Webb Space Telescope Primary Mirror Engineering Design Unit (EDU) recently demonstrated the final manufacturing process at L-3-SSG/Tinsley in Richmond, California. Shown in the picture below, the EDU is a prototype 1.4 meter diameter Beryllium mirror that is identical to the 18 flight mirror segments and is used to check out all mirror manufacturing processes prior to the actual flight mirror processing. This recent result gives confidence that all manufacturing processes are in place to figure the 18 flight mirrors. Lessons learned from the EDU have been applied to the flight mirrors improving the performance and processing time and all 18 flight mirrors are well along in their processing at L3-SSG/Tinsley. As a result of completing the final manufacturing demonstration, the EDU mirror was sent to Ball Aerospace in Boulder, Colorado where it is now undergoing integration with the hexapod mount assembly and optical testing checkout. After integration to mount assemblies, flight mirrors will be sent for cryogenic (50 degrees Kelvin) optical testing where the cryogenic distortions will be measured. After cryogenic testing, mirrors will eventually be returned to Tinsley for final cryogenic polishing. During final cryogenic polishing, the inverse of the measured cryogenic distortions will be polished into the mirror to assure the mirror works at it's cryogenic operating temperature. Once cryogenic polishing is completed to final specifications, the mirror will be coated and sent for final cryogenic testing.

Alongi, Chris

James Webb Space Telescope (JWST) Primary Mirror Material Selection

The James Webb Space Telescope (JWST) conducted a phase down select process via the Advanced Mirror System Demonstrator (AMSD) project to assess the Technology Readiness Level of various candidate mirror materials. This process culminated in the selection of Beryllium as the JWST primary mirror material. This paper outlines the mirror evaluation process, defines the selection criteria and summarizes the candidate mirror's performances.

Stahl, H. Philip