Search NASA⌕ Search

Engineering topics

Than, Roberto

Publications and source records attributed to Than, Roberto.

Analysis of pressure test results of tube fittings for the potential application in cryo systems for helium leak rate reduction

Due to the nature of Helium, it is notoriously difficult to maintain a closed system without experiencing helium inventory loss through leakage in large tubing and piping runs. There are two standard fitting options readily available for piping and tubing assemblies, welded fittings or Swagelok ® . Welding is the best option for leak rate reduction, but more costly than Swagelok ® . A new style of fitting has come to the attention of BNL C-AD Cryo group, and a pressure test and leak rate analysis were performed to evaluate the viability of incorporating this new style fitting into current engineering design of warm helium tubing runs for the purpose of leak rate reduction.

43 PARTICLE ACCELERATORS↗

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

High current, high-temperature operation test of the superconducting magnets in the RHIC yellow ring

We report on the tests conducted at the end of RHIC Run 21 to evaluate the operation of superconducting magnets in the RHIC yellow ring at higher currents – up to 5500 A for the arc dipoles and all other magnets on the dipole bus and the focusing arc quadrupoles, up to 5750 A for defocusing arc quadrupoles and up to 6000 A for the insertion quadrupoles Q1 through Q9 – and higher temperatures – up to 5.1 K – than routine. None of the magnets quenched. This is an encouraging finding as the superconducting magnet coils could reach up to 4.9 K during operation with the 275 GeV EIC hadron beams.

43 PARTICLE ACCELERATORS↗