Engineering topics
Thieberger, P
Publications and source records attributed to Thieberger, P.
Beam experiments towards high-intensity beams in RHIC
Proton bunch intensities in RHIC are planned to be increased from 2 {center_dot} 10{sup 11} to 3 {center_dot} 10{sup 11} protons per bunch to increase the luminosity, together with head-on beam-beam compensation using electron lenses. To study the feasibility of the intensity increase, beam experiments are being performed. Recent experimental results are presented.
A split-electrode for clearing scattered electrons in the RHIC e-lens
We are designing two electron lenses that will be installed at RHIC IR10 to compensate for the head-on beam-beam effect. To clear accumulated scattered electrons from 100 GeV proton-electron head-on collisions in the e-lens, a clearing split electrode may be constructed. The feasibility of this proposed electrode was demonstrated via the CST Particle Studio and Opera program simulations. By splitting one of the drift tubes in the e-lens and applying {approx} 380 V across the two parts, the scattered electrons can be cleared out within several hundred micro-seconds. At the same time we can restrict the unwanted shift of the primary electron-beam that already passed the 2-m interaction region in e-lens, to less than 15um.
Conceptual design of a high precision dual directional beam position monitoring system for beam crosstalk cancellation and improved output pulse shapes
The Relativistic Heavy Ions Collider (RHIC) would benefit from improved beam position measurements near the interaction points that see both beams, especially as the tolerances become tighter when reducing the beam sizes to obtain increased luminosity. Two limitations of the present beam position monitors (BPMs) would be mitigated if the proposed approach is successful. The small but unavoidable cross-talk between signals from bunches traveling in opposite directions when using conventional BPMs will be reduced by adopting directional BPMs. Further improvements will be achieved by cancelling residual cross-talk using pairs of such BPMs. Appropriately delayed addition and integration of the signals will also provide pulses with relatively flat maxima that will be easier to digitize by relaxing the presently very stringent timing requirements.
RHIC performance for FY2011 Au+Au heavy ion run
Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run, RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of 'common' RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals. At the conclusion of the FY 2011 polarized proton run, preparations for heavy ion run proceeded on April 18, with Au+Au collisions continuing through June 28. Our standard operations at 100 GeV/nucleon beam energy was bracketed by two shorter periods of collisions at lower energies (9.8 and 13.5 GeV/nucleon), continuing a previously established program of low and medium energy runs. Table 1 summarizes our history of heavy ion operations at RHIC.