Search NASASearch

Engineering topics

Thornton, Marla S.

Publications and source records attributed to Thornton, Marla S..

Using Quality Attributes to Bridge Systems Engineering Gaps : A Juno Ground Data Systems Case Study

The Juno Mission to Jupiter is the second mission selected by the NASA New Frontiers Program. Juno launched August 2011 and will reach Jupiter July 2016. Juno's payload system is composed of nine instruments plus a gravity science experiment. One of the primary functions of the Juno Ground Data System (GDS) is the assembly and distribution of the CFDP (CCSDS File Delivery Protocol) product telemetry, also referred to as raw science data, for eight out of the nine instruments. The GDS accomplishes this with the Instrument Data Pipeline (IDP). During payload integration, the first attempt to exercise the IDP in a flight like manner revealed that although the functional requirements were well understood, the system was unable to meet latency requirements with the as-is heritage design. A systems engineering gap emerged between Juno instrument data delivery requirements and the assumptions behind the heritage flight-ground interactions. This paper describes the use of quality attributes to measure and overcome this gap by introducing a new systems engineering activity, and a new monitoring service architecture that successfully delivered the performance metrics needed to validate Juno IDP.

Ground Data Systems (GDS)

We're Here to Help You

Air Force lore tells us that the two biggest lies you will ever hear on the tarmac are when the Inspector General steps off the plane and says to the Wing Commander, "We're here to help you," and the Wing Commander replies, "We're glad to see you." Not too surprisingly, a similar relationship is often perceived between a project manager and the mission assurance representative (especially for operations). This perception intensifies as budgets shrink and missions shorten, after all, where is the value added? That is the question we will examine for three small, short projects: Phoenix, WISE, and Grail (which is yet to launch). All have limited resources to devote to "niceties" and a very short mission to reap the benefits for their operations. We will examine how mission operations assurance evolved for each project, what worked well, what could have been improved, and how these lessons can be applied to ensure mission operations assurance is a value added function for Grail and future small missions.

Topex