2010 JANNAF Abstract Propulsion System Status: Ares First Stage
In November 2005, NASA created the Constellation Program to develop an entirely new fleet of spacecraft to include the Ares I Crew Launch Vehicle and the Ares V Cargo Launch vehicles. The Ares I First Stage Team has made significant progress on the design of a propulsion system capable of lofting that new fleet. To minimize technical risks and development costs, the Solid Rocket Boosters (SRBs) of Shuttle served as a starting point in the design of a new motor that would meet the requirements of those new vehicles. By bringing in a fifth segment, this new propulsive element will provide greater total impulse to loft a safer, more powerful fleet of space flight vehicles. Additional modifications include the use of composite structures, new metallic forward structures, new parachutes, a new propellant grain design, and a new nozzle. Although still ongoing and in process, significant design, development and concept testing has already been conducted. This includes a full-scale motor firing, deceleration subsystem testing, and testing of several complete avionics line replaceable units. The suborbital development flight, Ares I-X, provided the opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack. The Ares I-X test flight has also informed our Ares First Stage design. It brought a more comprehensive understanding in a number of areas, which are now being analyzed. This paper will provide an overview of the design, development, challenges, and progress on the production of the new Ares First Stage propulsion system. Challenges and mitigation strategies will be addressed. An overview will also be included of testing to date.
Ares First Stage Element Status
This slide presentation summarizes the status of the various elements of the first stage of the Ares I vehicle. It includes views of the first stage in relation to the complete Ares rocket, details of the first stage, upgrades for the Ares, the Avionics system, and the thrust oscillation system. There are also pictures from the testing.
Ares I First Stage: Powering Exploration
I. Ares First Stage design is on schedule. a) Avionics; b) Major Structures; c) Motor; and d) Deceleration System II. Ares I-X hardware is complete and assembly at KSC is underway. Launch scheduled for October 31. III. Recovery system testing is on schedule a) Drogue; b) Main chute; and c) Cluster. DM-1 static firing is scheduled for August 25, 2009
Ares I First Stage: Powering Exploration
he mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This presentation provides an overview and update on the design and development of the Ares I First Stage Propulsion system.
Understanding and Resolution of the Block 2 SSME, STS-104 Engine Shutdown Pressure Surge In-flight Anomaly
STS-104, launched July 2001, marked the first flight of a single Block 2 Space Shuttle Main Engine (SSME). This new configuration of the SSME is the culmination of well over a decade of gradual engine system upgrades. The launch and mission were a success. However, in the process of post-launch data analysis a Main Propulsion System (MPS) anomaly was noted and tied directly to the shutdown of the Block 2 SSME. An investigation into this anomaly was organized across NASA facilities and across the various hardware component contractors. This paper is a very brief summary of the eventual understanding of the root causes of the anomaly and the process whereby an appropriate mitigation action was proposed. An analytical model of the High Pressure Fuel Pump (HPFP) and the low pressure fuel system of the SSME is presented to facilitate the presentation of this summary. The proposed mitigation action is discussed and, with the launch of STS-108 in November 2001, successfully demonstrated under flight conditions.
Propellant Densification for Shuttle: The SSME Perspective
The subject of cryogenic propellant densification as a potential upgrade to the Space Shuttle is a subject that has been raised on several occasions over the last decade. Due to advancements in densification technology made as a part of and in parallel to the X-33 project, the subject was raised and studied once again in May 2001. Across the Space Shuttle program people from many disciplines converged to discuss issues and perform trade studies to determine whether densified propellants was worth pursuing. This paper discusses one of these areas, specifically the Space Shuttle Main Engine (SSME). The effects of propellant densification on steady state performance are presented along with discussions of potential transient performance issues. Engine component redesign and retrofit issues are discussed as well the high level requirements to modify the ground test stands to accommodate propellant densification hardware and tanks. And finally, the matter of programmatic concerns enters the subject at hand as part of a discussion of SSME recertification requirements. In the end, potential benefits to SSME performance can be demonstrated and, subject to the densification scheme chosen, there does not appear to insurmountable technical obstacles.
Converting information from paper to optical media
The technology of converting large amounts of paper into electronic form is described for use in information management systems based on optical disk storage. The space savings and photographic nature of microfiche are combined in these systems with the advantages of computerized data (fast and flexible retrieval of graphics and text, simultaneous instant access for multiple users, and easy manipulation of data). It is noted that electronic imaging systems offer a unique opportunity to dramatically increase the productivity and profitability of information systems. Particular attention is given to the CALS (Computer-aided Aquisition and Logistic Support) system.