Design of the Wendelstein 7-X Inertially Cooled Test Divertor Unit Scraper Element
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Titus, Peter.
Explore the source record for details and available documents.
A DEMO device has been considered the next step following ITER as a near-term prototypical reactor design that is tritium self-sufficient and produces a limited amount of net electricity. The machine maintenance approach and planned configuration concept plays a major role in establishing the design point. DEMO will also need to show that adequate operating availability can be achieved over a reasonable time period, as a last step before full-scale electricity production. The ability to operate with high availability/reliability plays a key ingredient in defining the DEMO configuration, fostering the need for rapid removal/replacement of limited-life in-vessel components. DEMO pre-conceptual studies are being carried out by South Korea (with US participation) and other countries. The device designs span a range of maintenance approaches from full radial extraction of large in-vessel modules through all TF horizontal openings to vertical maintenance of segmented in-vessel components. Progress made on the S. Korea's K-DEMO design will be provided with emphasis on the design choices identified to promote high availability.