Search NASA⌕ Search

Engineering topics

Todd, Austin

Publications and source records attributed to Todd, Austin.

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Advanced Computing, Data Science, and Artificial Intelligence Research Opportunities for Energy-Focused Transportation Science

The Energy Efficient Mobility Systems (EEMS) technology landscape is complex and rapidly evolving, which provides both tremendous opportunities and formidable challenges. Significant alterations to the mobility landscape are underway due to the advent of vehicle and infrastructure connectivity, autonomous driving, and rapid passenger- and freight-vehicle electrification. Advanced computing will play an increasingly important role in enabling the EEMS program to understand and identify the most important levers to improve the energy productivity of future integrated mobility systems. It is also driving new approaches to mobility and the research to unlock an affordable, efficient, safe, and accessible transportation future. Driving much of this change is the collection, analysis, and strategic use of massive amounts of diverse, complex data from infrastructure and vehicles with on-board sensors and data storage and transmission capabilities. Diverse and representative data are key to implementing approaches to maximize mobility energy productivity. While high-fidelity modeling of integrated transportation networks has strengthened our understanding of dynamic movement and behavior patterns, existing tools must be expanded beyond their current focus. This work necessitates data infrastructure investments (e.g., secure-streaming data platforms driven by ubiquitous sensors and video analytics) as well as investments in critical capabilities for large-scale automated analysis and organization using modern machine learning, statistics, and artificial intelligence. Other chief needs include agile, large-scale storage that can be quickly searched and queried for relevant data to support validation and model development, data-sharing agreements, and formatting standards for key data types. The future of public transit must be explored in greater detail, research must inform design, and opportunities must be identified for improving the mobility productivity of public transit in both urban and rural America.

33 ADVANCED PROPULSION SYSTEMS↗