Engineering topics
Tooley, Craig
Publications and source records attributed to Tooley, Craig.
The Robotic Lunar Exploration Program (RLEP): An Introduction to the Goals, Approach, and Architecture
The Vision for Space Exploration calls for undertaking lunar exploration activities to enable sustained human and robotic exploration of Mars and beyond, including more distant destinations in the solar system. In support of this vision, the Robotic Lunar Exploration Program (RLEP) is expected to execute a series of robotic missions to the Moon, starting in 2008, in order to pave the way for further human space exploration. This paper will give an introduction to the RLEP program office, its role and its goals, and the approach it is taking to executing the charter of the program. The paper will also discuss candidate architectures that are being studied as a framework for defining the RLEP missions and the context in which they will evolve.
The IRIS-GUS Shuttle Borne Upper Stage System
This paper describes the Italian Research Interim Stage - Gyroscopic Upper Stage (IRIS-GUS) upper stage system that will be used to launch NASA's Triana Observatory from the Space Shuttle. Triana is a pathfinder earth science mission being executed on rapid schedule and small budget, therefore the mission's upper stage solution had to be a system that could be fielded quickly at relatively low cost and risk. The building of the IRIS-GUS system wa necessary because NASA lost the capability to launch moderately sized upper stage missions fro the Space Shuttle when the PAM-D system was retired. The IRIS-GUS system restores this capability. The resulting system is a hybrid which mates the existing, flight proven IRIS (Italian Research Interim Stage) airborne support equipment to a new upper stage, the Gyroscopic Upper Stage (GUS) built by the GSFC for Triana. Although a new system, the GUS exploits flight proven hardware and design approaches in most subsystems, in some cases implementing proven design approaches with state-of-the-art electronics. This paper describes the IRIS-GUS upper stage system elements, performance capabilities, and payload interfaces.
Jettison system for a large inflatable antenna
This paper describes a jettison system used to separate a large, inflatable-deployable antenna from a free-flying spacecraft. The jettison system consists of four discrete Marman band clamps, released simultaneously via pyrotechnics. The design, analysis, analytical simulation, and testing of the system are discussed. Of particular note is the correlation of test results with the Marman band design calculations.