Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab's Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 60,000-liter tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels will be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, J. [Fermilab] (ORCID:0009000185837576)

Fabrication of the HFVMTF Double-Bath Cryostat

The High Field Vertical Magnet Test Facility (HFVMTF) at Fermilab is designed to test superconducting magnets up to 20 tons and 1.3 meters in diameter. Central to the facility is a double-bath superfluid helium cryostat reaching 1.8 K at 1.2 bar. Integrated with a 15 T superconducting dipole from LBNL, HFVMTF supports HTS cable testing for fusion applications. This paper presents the design and fabrication of the cryostat, with a focus on two complex components: the 2 K heat exchanger and the lambda plate. The heat exchanger thermally links sub-atmospheric and pressurized helium baths. The 1.4-meter lambda plate provides thermal isolation and structural support for over 20 tons under 1.3 bar pressure differential. Finite Element Analysis validated the vessel's integrity under maximum load conditions.

Bruce, R. [Fermilab] (ORCID:0000000234200612)

Current Progress on the High-Field Cable Testing Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is constructing a new High Field Vertical Magnet Test Facility (HFVMTF) with capabilities comparable to the European facilities EDIPO and FRESCA2. The facility, located at Fermilab, will feature a background magnetic field of 15 T, generated by a magnet provided by Lawrence Berkeley National Laboratory (LBNL). The HFVMTF will support two U.S. national programs under the DOE Office of Science: the U.S. Fusion Energy Science (FES) program and the Magnet Development Program (MDP). It will enable the testing of HTS samples in high magnetic fields across a wide range of temperatures and facilitate the development of hybrid magnets combining LTS and HTS superconductors. This paper presents an overview of the current progress in constructing the facility, including updates on the test cryostat, power supplies, and systems for quench protection and monitoring.

Velev, G. [Fermilab]