Search NASA⌕ Search

Engineering topics

Tropin, I.

Publications and source records attributed to Tropin, I..

Pressure Spike in The LBNF Absorber Core s Gun Drilled Cooling Channel from an Accident Beam Pulse

The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. The cooling water is supplied by the LBNF Absorber Radioactive Water (RAW) cooling system which is designed as per ASME B31.3 Normal Fluid Service [1]. An uninhibited beam accident pulse striking the water channels was identified as a credible accident scenario. In this study, it is assumed that the beam pulse hits the Absorber directly without interacting with any of the other upstream beamline components. The beam parameters used for the LBNF beam are 120 GeV, 2.4 MW with a 1.2 s cycle time. The accident pulse lasts for 10 μs. The maximum energy is deposited in the 3rd aluminum core block. For the sake of simplicity, it is assumed that the accident pulse strikes the 1 in. ID water channel directly. The analysis here simulates the pressure rise in the water during and after the beam pulse and its effects on the aluminum piping components that deliver water to the core blocks. The weld strengths as determined by the Load and Resistance Factor Design (LRDF) and the Allowable Strength Design (ASD) are compared to the forces generated in the weld owing to the pressure spike. A transient structural analysis was used to determine the equivalent membrane, peak, and bending stresses and they were com-pared to allowable limits.

43 PARTICLE ACCELERATORS↗

Feasibility of using crystal channeling for the beam loss mitigation in slow extraction at 8GeV

In the accelerator applications of slow extraction for High Energy Physics (HEP), one of the prime challenges is the mitigation of beam losses, which is becoming increasingly critical with the continuous rise in beam power. A significant breakthrough was achieved earlier at CERN through the successful deployment of proton beam channeling in a crystal at 400GeV, effectively diverting the beam away from extraction septa and offering new avenues for improving slow extraction efficiency. However, a crucial question remains whether this approach is still effective at lower and medium proton beam energies. In this paper, we present the promising results of the computer simulation studies of the septum shadowing at 8GeV for the Mu2e project slow extraction at Fermilab. In conclusion, across the wide range of beam parameters, the beam loss reduction is shown to range between 40% and factor of three.

43 PARTICLE ACCELERATORS↗

Comparison of residual dose rates from MARS and DORIAN simulations with experimental data from the SINBAD database

This benchmarking study aims to compare residual dose rate predictions from the MARS and DORIAN codes with experimental measurements taken from samples irradiated at CERN's CERF facility. The research evaluates the residual dose rates of these samples over varied cooling intervals. Additionally, it delves into the influence of parameter choices, such as specific physics processes and energy thresholds, on the production and transport of particles and their effects on simulation outcomes. While both MARS and DORIAN largely align with experimental findings, discrepancies were observed in the copper sample. This prompted an in-depth examination of the elevated dose rates from MARS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Critical problems of energy frontier Muon Colliders: optics, magnets and radiation

This White Paper brings together our previous studies on a Muon Collider (MC) and presents a design concept of the 6 TeV MC optics, the superconducting (SC) magnets, and a preliminary analysis of the protection system to reduce magnet radiation loads as well as particle backgrounds in the detector. The SC magnets and detector protection considerations impose strict limitations on the lattice choice, hence the design of the collider optics, magnets and Machine Detector Interface (MDI) are closely intertwined. As a first approximation we use the Interaction Region (IR) design with beta-star=3 mm, whereas for the arcs we re-scale the arc cell design of the 3 TeV MC. Traditional cos-theta coil geometry and Nb3Sn superconductor were used to provide field maps for the analysis and optimization of the arc lattice and IR design, as well as for studies of beam dynamics and magnet protection against radiation. The stress management in the coil will be needed to avoid large degradation or even damage of the brittle SC coils. In the assumed IR designs, the dipoles close to the Interaction Point (IP) and tungsten masks in each IR (to protect magnets) help reducing background particle fluxes in the detector by a substantial factor. The tungsten nozzles in the 6 to 600 cm region from the IP, assisted by the detector solenoid field, trap most of the decay electrons created close to the IP as well as most of the incoherent electron-positron pairs generated in the IP. With sophisticated tungsten, iron, concrete and borated polyethylene shielding in the MDI region, the total reduction of background loads by more than three orders of magnitude can be achieved.

43 PARTICLE ACCELERATORS↗

Final report: Conceptual design of a 10-megawatt electron beam irradiation facility for bio-solid waste treatment

In this report, a conceptual design is proposed for a 10 mega-watt (MW) electron beam accelerator for wastewater treatment. This is done by applying the latest accelerator technologies developed at Fermilab and within the Department of Energy (DOE) Office of Science laboratory complex. This report expands on previous work on the 1 MW accelerator, which was developed with requirements from Metropolitan Water Reclamation District (MWRD) in Chicago. The full report of the previous effort is available from the Office of High Energy Physics Accelerator Stewardship Program [1].

43 PARTICLE ACCELERATORS↗

Fermilab Recycler Collimation System Design

To provide 700 kW proton beams for neutrino production in the NuMI facility, we employ slip stacking in the Recycler with transfer to the Main Injector for recapture and acceleration. Slip stacking with 12 Booster batches per 1.33 sec cycle of the Main Injector has been implemented and briefly tested while extensive operation with 8 batches and 10 batches per MI cycle has been demonstrated. Operation in this mode since 2013 shows that loss localization is an essential component for long term operation. Beam loss in the Recycler will be localized in a collimation region with design capability for absorbing up to 2 kW of lost protons in a pair of 20-Ton collimators (absorbers). This system will employ a two stage collimation with a thin molybdenum scattering foil to define the bottom edge of both the injected and decelerated-for-slipping beams. Optimization and engineering design of the collimator components and radiation shielding are based on comprehensive MARS15 simulations predicting high collimation efficiency as well as tolerable levels of prompt and residual radiation. The system installation during the Fermilab 2016 facility shutdown will permit commissioning in the subsequent operating period.

43 PARTICLE ACCELERATORS↗