Surface Buildup Scenarios and Outpost Architectures for Lunar Exploration

The Constellation Program Architecture Team and the Lunar Surface Systems Project Office have developed an initial set of lunar surface buildup scenarios and associated polar outpost architectures, along with preliminary supporting element and system designs in support of NASA's Exploration Strategy. The surface scenarios are structured in such a way that outpost assembly can be suspended at any time to accommodate delivery contingencies or changes in mission emphasis. The modular nature of the architectures mitigates the impact of the loss of any one element and enhances the ability of international and commercial partners to contribute elements and systems. Additionally, the core lunar surface system technologies and outpost operations concepts are applicable to future Mars exploration. These buildup scenarios provide a point of departure for future trades and assessments of alternative architectures and surface elements.

Mazanek, Daniel D.↗

NASA Langley Research Center Systems Analysis & Concepts Directorate Participation in the Exploration Systems Architecture Study

The NASA Langley Research Center (LaRC) Systems Analysis & Concepts Directorate (SACD) began studying human exploration missions beyond low Earth orbit (LEO) in the year 1999. This included participation in NASA s Decadal Planning Team (DPT), the NASA Exploration Team (NExT), Space Architect studies and Revolutionary Aerospace Systems Concepts (RASC) architecture studies that were used in formulating the new Vision for Space Exploration. In May of 2005, NASA initiated the Exploration Systems Architecture Study (ESAS). The primary outputs of the ESAS activity were concepts and functional requirements for the Crewed Exploration Vehicle (CEV), its supporting launch vehicle infrastructure and identification of supporting technology requirements and investments. An exploration systems analysis capability has evolved to support these functions in the past and continues to evolve to support anticipated future needs. SACD had significant roles in supporting the ESAS study team. SACD personnel performed the liaison function between the ESAS team and the Shuttle/Station Configuration Options Team (S/SCOT), an agency-wide team charged with using the Space Shuttle to complete the International Space Station (ISS) by the end of Fiscal Year (FY) 2010. The most significant of the identified issues involved the ability of the Space Shuttle system to achieve the desired number of flights in the proposed time frame. SACD with support from the Kennedy Space Center performed analysis showing that, without significant investments in improving the shuttle processing flow, that there was almost no possibility of completing the 28-flight sequence by the end of 2010. SACD performed numerous Lunar Surface Access Module (LSAM) trades to define top level element requirements and establish architecture propellant needs. Configuration trades were conducted to determine the impact of varying degrees of segmentation of the living capabilities of the combined descent stage, ascent stage, and other elements. The technology assessment process was developed and implemented by SACD as the ESAS architecture was refined. SACD implemented a rigorous and objective process which included (a) establishing architectural functional needs, (b) collection, synthesis and mapping of technology data, and (c) performing an objective decision analysis resulting in technology development investment recommendations. The investment recommendation provided budget, schedule, and center/program allocations to develop required technologies for the exploration architecture, as well as the identification of other investment opportunities to maximize performance and flexibility while minimizing cost and risk. A summary of the trades performed and methods utilized by SACD for the Exploration Systems Mission Directorate (ESAS) activity is presented along with how SACD is currently supporting the implementation of the Vision for Space Exploration.

Keyes, Jennifer↗

Orbital Aggregation and Space Infrastructure Systems (OASIS)

This paper summarizes the results of a NASA lead study performed to identify synergistic opportunities and concepts between human exploration initiatives and commercialization of space. The goal of this initiative, called Orbital Aggregation & Space Infrastructure Systems (OASIS), is to develop an in-space architecture and associated concepts that provide common infrastructure for enabling a large class of space missions. The concepts include communications, navigation and power systems, propellant modules, tank farms, habitats, and in-space transportation systems using several propulsion technologies. OASIS features in-space aggregation of systems and resources in support of mission objectives. The concepts feature a high level of reusability and are supported by inexpensive launch of propellant and logistics payloads from the Earth/moon system. Industry, NASA and other users could share infrastructure costs. The anticipated benefits of synergistic utilization of space infrastructure are reduced mission costs and increased mission flexibility for future space exploration and commercialization initiatives.

Troutman, Patrick A.↗

International Space Station (ISS) Accommodation of a Single US Assured Crew Return Vehicle (ACRV)

The following report was generated to give the International Space Station (ISS) Program some additional insight into the operations and issues associated with accommodating a single U.S. developed Assured Crew Return Vehicle (ACRV). During the generation of this report, changes in both the ISS and ACRV programs were factored into the analysis with the realization that most of the work performed will eventually need to be repeated once the two programs become more integrated. No significant issues associated with the ISS accommodating the ACRV were uncovered. Kinematic analysis of ACRV installation showed that there are viable methods of using Shuttle and Station robotic manipulators. Separation analysis demonstrated that the ACRV departure path clears the Station structure for all likely contingency scenarios. The payload bay packaging analysis identified trades that can be made between payload bay location, Shuttle Remote Manipulator System (SRMS) reach and eventual designs of de-orbit stages and docking adapters.

Mazanek, Daniel D.↗

Satellite Systems Design/Simulation Environment: A Systems Approach to Pre-Phase A Design

A toolset for the rapid development of small satellite systems has been created. The objective of this tool is to support the definition of spacecraft mission concepts to satisfy a given set of mission and instrument requirements. The objective of this report is to provide an introduction to understanding and using the SMALLSAT Model. SMALLSAT is a computer-aided Phase A design and technology evaluation tool for small satellites. SMALLSAT enables satellite designers, mission planners, and technology program managers to observe the likely consequences of their decisions in terms of satellite configuration, non-recurring and recurring cost, and mission life cycle costs and availability statistics. It was developed by Princeton Synergetic, Inc. and User Systems, Inc. as a revision of the previous TECHSAT Phase A design tool, which modeled medium-sized Earth observation satellites. Both TECHSAT and SMALLSAT were developed for NASA.

Ferebee, Melvin J., Jr.↗

A Functional Simulator of Spacecraft Resources

The SPAcecraft SIMulator (SPASIM) simulates the functions and resources of a spacecraft to quickly perform Phase A trade-off analyses and uncover any operational bottlenecks during any part of the mission. Failure modes and operational contingencies can be evaluated allowing optimization for a range of mission scenarios. The payloads and subsystems are simulated, using a hierarchy of graphical models, in terms of how their functions affect resources such as propellant, power, and data. Any of the inputs and outputs of the payloads and subsystems can be plotted during the simulation. Most trade-off analyses, including those that compare current versus advanced technology, can be performed by changing values in the parameter menus. However, when a component is replaced by one with a different functional architecture, its graphical model can also be modified or replaced by drawing from a component library. SPASIM has been validated using several spacecraft designs which were at least at the Critical Design Review level. The user and programmer guide, including figures, is available on line as a hyper text document. This is an easy-to-use and expand tool which is based on MATLAB and SIMULINK. It runs on SGI workstations and PCs under Windows 95 or NT.

Liceaga, Carlos A.↗

Space Station Freedom assembly and operation at a 51.6 degree inclination orbit

This study examines the implications of assembling and operating Space Station Freedom at a 51.6 degree inclination orbit utilizing an enhanced lift Space Shuttle. Freedom assembly is currently baselined at a 220 nautical mile high, 28.5 degree inclination orbit. Some of the reasons for increasing the orbital inclination are (1) increased ground coverage for Earth observations, (2) greater accessibility from Russian and other international launch sites, and (3) increased number of Assured Crew Return Vehicle (ACRV) landing sites. Previous studies have looked at assembling Freedom at a higher inclination using both medium and heavy lift expendable launch vehicles (such as Shuttle-C and Energia). The study assumes that the shuttle is used exclusively for delivering the station to orbit and that it can gain additional payload capability from design changes such as a lighter external tank that somewhat offsets the performance decrease that occurs when the shuttle is launched to a 51.6 degree inclination orbit.

Troutman, Patrick A.↗

Space Station Freedom contingency reboost and resupply strategies

The objective of this study was to determine the requirements necessary to ensure a viable Space Station Freedom (SSF) in the event of a delay in the date of the first element launch, and/or in the event that the nominal assembly sequence is interrupted, perhaps due to a delay in the Space Shuttle Launch Schedule. Orbit lifetimes, reboost fuel requirements, and controllability requirements were calculated for each stage of the SSF assuming anywhere from a 6 to 24 month delay/interruption in the baseline SSF assembly sequence. These results were assessed in order to formulate strategies to assure SSF viability in the presence of assembly sequence delays and interruptions.

Troutman, Patrick A.↗

Restructured Freedom configuration characteristics

In Jan. 1991, the LaRc SSFO performed an assessment of the configuration characteristics of the proposed pre-integrated Space Station Freedom (SSF) concept. Of particular concern was the relationship of solar array operation and orientation with respect to spacecraft controllability. For the man-tended configuration (MTC), it was determined that torque equilibrium attitude (TEA) seeking Control Moment Gyroscope (CMG) control laws could not always maintain attitude. The control problems occurred when the solar arrays were tracking the sun to produce full power while flying in an arrow or gravity gradient flight mode. The large solar array articulations that sometimes result from having the functions of the alpha and beta joints reversed on MTC induced large product of inertia changes that can invalidate the control system gains during an orbit. Several modified sun tracking techniques were evaluated with respect to producing a controllable configuration requiring no modifications to the CMG control algorithms. Another assessment involved the permanently manned configuration (PMC) which has a third asymmetric PV unit on one side of the transverse boom. Recommendations include constraining alpha rotations for MTC in the arrow and gravity gradient flight modes and perhaps developing new non-TEA seeking control laws. Recommendations for PMC include raising the operational altitude and moving to a symmetric configuration as soon as possible.

Troutman, Patrick A.↗

Pre-integrated structures for Space Station Freedom

An in-space construction (erectable) approach to assembling Freedom is planned but the increasing complexity of the station design along with a decrease in shuttle capability over the past several years has led to an assembly sequence that requires more resources (EVA, lift, volume) than the shuttle can provide given a fixed number of flights. One way to address these issues is to adopt a pre-integrated approach to assembling Freedom. A pre-integrated approach combines station primary structure and distributed systems into discrete sections that are assembled and checked out on the ground. The section is then launched as a single structural entity on the shuttle and attached to the orbiting station is then launched as a single structural entity on the shuttle and attached to the orbiting station with a minimum of EVA. The feasibility of a pre-integrated approach to assembling Freedon is discussed. The structural configuration, packaging, and shuttle integration of discrete pre-integrated elements for Freedom assembly are discussed. It is shown that the pre-integrated approach to assembly reduces EVA and increases shuttle margin with respect to mass, volume, and center of gravity limits when compared to the baseline Freedom assembly sequence.

Cruz, Jonathan N.↗

Orbiter utilization as an ACRV

Assuming that a Shuttle Orbiter could be qualified to serve long duration missions attached to Space Station Freedom in the capacity as an Assured Crew Return Vehicle (ACRV), a study was conducted to identify and examine candidate attach locations. Baseline, modified hardware, and new hardware design configurations were considered. Dual simultaneous Orbiter docking accommodation were required. Resulting flight characteristics analyzed included torque equilibrium attitude (TEA), microgravity environment, attitude controllability, and reboost fuel requirements. The baseline Station could not accommodate two Orbiters. Modified hardware configurations analyzed had large TEA's. The utilization of an oblique docking mechanism best accommodated an Orbiter as an ACRV.

Cruz, Jonathan N.↗

Low earth orbit infrastructure to accommodate manned lunar missions

In order to establish bases on the lunar and Mars surfaces, a significant amount of orbital infrastructure including assembly platforms, cryogenic fluids depots, and Space Station Freedom, will be required in LEO. These facilities will be required to perform a myriad of functions ranging from orbital demonstration of advanced technology systems and establishment of life science capabilities to servicing and refurbishment of reusable lunar transfer vehicles. This paper addresses the requirements levied on these facilities and provides an overview of potetial LEO infrastructure elements that satisfy various advanced manned missions. Of key importance to the success of the manned lunar mission are (1) the evolutionary growth of Space Station Freedom to serve as a transportation node and (2) the development of a Shuttle-derived launch vehicle to deliver mission elements to LEO.

Cirillo, William M.↗

Lunar vehicle assembly and processing on Space Station Freedom

A concept is proposed that permits the accommodation of lunar vehicles on Space Station Freedom (SSF) within the context of the Human Exploration Initiative. The facility required for lunar-vehicle processing is defined with references to the types of support equipment assumed for these tasks. Attention is given to the SSF Assembly Complete, verification of the Lunar Transfer Vehicles (LTVs), and the attachments of reusable vs expendable LTVs. The impact of the assembly and processing operations is delineated with specific qualifications for revising the allowances for vehicle mass and controllability, reboost fuel needs, microgravity activities, and flight attitude. EVA working time is estimated for overhead and truss-assembly operations at about 3 months to support reusable LTV operations on the SSF. An Assembly/Servicing Facility is proposed for these activities with specific hardware options, and a hydrogen-oxygen propulsion system is proposed to make these activities more efficient.

Troutman, Patrick A.↗

Shuttle-C utilization for assembly of the rephased Freedom configuration

The utilization of the Shuttle-C Heavy Lift Launch Vehicle (HLLV) to augment the Shuttle orbiter to deliver to earth orbit elements for assembly of a rephased definition of Space Station Freedom is assessed. A past history of previous HLLV studies performed with respect to Freedom launch and assembly is reviewed and conclusions extrapolated that are appropriate to consider for the new rephased Freedom definition. The rephased Freedom definition is explained, two utilization scenarios are developed and related assessments are provided for Shuttle-C utilization early in the assembly sequence or utilization later in theon-orbit build up phase.

Deryder, Leonard J.↗