Search NASA⌕ Search

Engineering topics

Urakawa, J

Publications and source records attributed to Urakawa, J.

Recent Studies in ATF Damping Ring

The damping ring of the Accelerator Test Facility (ATF) at KEK is designed to produce an extremely small vertical emittance beam as a test accelerator for future linear colliders. Development of various system and components for ILC (International Linear Collider) is also an important purpose of this facility. Though most of the beam time of ATF is dedicated to the final focus test project (ATF2), some studies have been performed in the damping ring. Here we report recent effort of low emittance tuning and multi-bunch extraction test of the fast kicker.

43 PARTICLE ACCELERATORS↗

A Comprehensive Study of Nanometer Resolution of the IPBPM at ATF2

High-resolution beam position monitors (IPBPMs) have been developed in order to measure the electron beam position at the focus point of ATF2 to a few nanometers in the vertical plane. To date, the IPBPM system has operated in test mode with a highest demonstrated resolution of 8.7 nm in the ATF extraction line during 2008. After expected noise source calculations there still remains 7.9 nm of noise of unexplained origin. We summarize the experimental work on the IPBPM system since this measurement and outline the possible origins of these sources. We then present a study plan to be performed at the ATF2 facility designed to identify and to improve the resolution performance and comment on the expected ultimate resolution of this system. The Accelerator Test Facility 2 (ATF2) is a test beamline for ILC final focus system in the framework of the ATF international collaboration which was constructed to extend the extraction line at ATF, located at KEK, Japan. There are two goals of the ATF2: firstly to demonstrate focusing to 37 nm vertical beam size, secondly to achieve a few nanometer level beam orbit stability at the focus point in the vertical plane. High-resolution beam position monitors (IPBPMs) for the interaction point (IP) have been developed in order to measure the electron beam position at the focus point of the ATF2 to a few nanometers in the vertical plane. The previous measured position resolution of IPBPMs was 8.7 nm for a 0.68 x 10{sup 10} e/bunch beam with a dynamic range of 5 {mu}m. The intrinsic noise of the system was estimated to be 2.6 nm at 10{sup 10} e/bunch. It is scaled to 3.8 nm at 0.68 x 10{sup 10} e/bunch which means that 7.9 nm of unknown noise remains. The origin of the unknown noise must be studied in order to improve the resolution. This paper describes the ongoing work to improve the resolution of IPBPMs.

43 PARTICLE ACCELERATORS↗

Status of the ATF2 Lattices

The current status for the ATF2 Nominal and Ultra-low {beta}* lattices are presented in this paper. New lattice designs have been obtained in order to minimise the impact of the last interpretation of multipole measurements that have been included into the model. However, the new ATF2 Ultra-low design is not able to recover the expected vertical beam size at the IP with the current magnet distribution. Therefore, different quadrupole sorting have been studied. A significant gain is evident for the ATF2 Ultra-low lattice when sorting the magnets according to the skew-sextupolar components. The ATF2 Nominal lattice is also expected to benefit from the new sorting. Tuning results of the new ATF2 Ultra-low lattice under realistic imperfections are also reported.

43 PARTICLE ACCELERATORS↗

Status of the ATF Damping Ring BPM Upgrade Project

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

High resolution BPMS with integrated gain correction system

High resolution beam position monitors (BPM) are an essential tool to achieve and reproduce a low vertical beam emittance at the KEK Accelerator Test Facility (ATF) damping ring. The ATF damping ring (DR) BPMs are currently upgraded with new high resolution read-out electronics. Based on analog and digital down-conversion techniques, the upgrade includes an automatic gain calibration system to correct for slow drift effects and ensure high reproducible beam position readings. The concept and its technical realization, as well as preliminary results of beam studies are presented.

43 PARTICLE ACCELERATORS↗