Search NASASearch

Engineering topics

Valencia, Lisa M.

Publications and source records attributed to Valencia, Lisa M..

Mars Atmosphere Resource Verification INsitu (MARVIN) - In Situ Resource Demonstration for the Mars 2020 Mission

The making of oxygen from resources in the Martian atmosphere, known as In Situ Resource Utilization (ISRU), has the potential to provide substantial benefits for future robotic and human exploration. In particular, the ability to produce oxygen on Mars for use in propulsion, life support, and power systems can provide significant mission benefits such as a reducing launch mass, lander size, and mission and crew risk. To advance ISRU for possible incorporation into future human missions to Mars, NASA proposed including an ISRU instrument on the Mars 2020 rover mission, through an announcement of opportunity (AO). The purpose of the the Mars Atmosphere Resource Verification INsitu or (MARVIN) instrument is to provide the first demonstration on Mars of oxygen production from acquired and stored Martian atmospheric carbon dioxide, as well as take measurements of atmospheric pressure and temperature, and of suspended dust particle sizes and amounts entrained in collected atmosphere gases at different times of the Mars day and year. The hardware performance and environmental data obtained will be critical for future ISRU systems that will reduce the mass of propellants and other consumables launched from Earth for robotic and human exploration, for better understanding of Mars dust and mitigation techniques to improve crew safety, and to help further define Mars global circulation models and better understand the regional atmospheric dynamics on Mars. The technologies selected for MARVIN are also scalable for future robotic sample return and human missions to Mars using ISRU.

Sanders, Gerald B.

Space-Based Range Safety and Future Space Range Applications

The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to demonstrate the performance, flexibility and cost savings that can be realized by using space-based assets for the Range Safety (global positioning system metric tracking data, flight termination command and range safety data relay) and Range User (telemetry) functions during vehicle launches and landings. Phase 1 included flight testing S-band Range Safety and Range User hardware in 2003 onboard a high-dynamic aircraft platform at Dryden Flight Research Center (Edwards, California) using the NASA Tracking and Data Relay Satellite System as the communications link. The current effort, Phase 2, includes hardware and packaging upgrades to the S-band Range Safety system and development of a high data rate Ku-band Range User system. The enhanced Phase 2 Range Safety Unit provided real-time video for three days during the historic GlobalFlyer (Scaled Composites, Mojave, California) flight in March, 2005. Additional Phase 2 testing will include a sounding rocket test of the Range Safety system and aircraft flight testing of both systems. Future testing will include a flight test on a launch vehicle platform. This report discusses both Range Safety and Range User developments and testing with emphasis on the Range Safety system. The operational concept of a future space-based range is also discussed.

Whiteman, Donald E.

Space-Based Telemetry and Range Safety Project Ku-Band and Ka-Band Phased Array Antenna

The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

Whiteman, Donald E.

Ku- and Ka-Band Phased Array Antenna for the Space-Based Telemetry and Range Safety Project

The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

Whiteman, Donald E.

Space-Based Range Safety and Future Space Range Applications

The National Aeronautics and Space Administration (NASA) Space-Based Telemetry and Range Safety (STARS) study is a multiphase project to demonstrate the performance, flexibility and cost savings that can be realized by using space-based assets for the Range Safety [global positioning system (GPS) metric tracking data, flight termination command and range safety data relay] and Range User (telemetry) functions during vehicle launches and landings. Phase 1 included flight testing S-band Range Safety and Range User hardware in 2003 onboard a high-dynamic aircraft platform at Dryden Flight Research Center (Edwards, California, USA) using the NASA Tracking and Data Relay Satellite System (TDRSS) as the communications link. The current effort, Phase 2, includes hardware and packaging upgrades to the S-band Range Safety system and development of a high data rate Ku-band Range User system. The enhanced Phase 2 Range Safety Unit (RSU) provided real-time video for three days during the historic Global Flyer (Scaled Composites, Mojave, California, USA) flight in March, 2005. Additional Phase 2 testing will include a sounding rocket test of the Range Safety system and aircraft flight testing of both systems. Future testing will include a flight test on a launch vehicle platform. This paper discusses both Range Safety and Range User developments and testing with emphasis on the Range Safety system. The operational concept of a future space-based range is also discussed.

Whiteman, Donald E.

Space-Based Telemetry And Range Safety Flight Demonstration #1

The basic ability of STARS to maintain a satellite communications link with TDRSS satellites during dynamic aircraft flights was successfully demonstrated during FD 1. The Range Safety and Range User systems' link margins were measured. The ability to acquire/reacquire and maintain lock between a high-dynamic vehicle and a satellite-based system was demonstrated. The Range Safety system simultaneously received and processed command links from space and ground transmitters and provided near real-time Range Safety telemetry to DFRC, which then sent it in near real time to KSC, GSFC, and WFF for monitoring. The GPS receiver maintained track except during extremely dynamic maneuvers. The Range User system sent data at three different data rates. There were excellent cooperation and support from the different Centers, contractors, and Ranges. A large amount of data was recorded and extensive post-flight analysis was performed. The Range User TDRSS link margin met or exceeded the predicted performance at three different data rates. The Range Safety launch-head link margins generally agreed with the predicted performance. The UPS positions and velocities agreed with those from tracking radar to within about 20 m and a few rn/s. The link margins for the Range Safety TDRSS telemetry link were less than expected. The link margin for one TDRSS command link LPT channel was occasionally much less than the other. Additional post-flight testing has yet to identify the root causes of these results. There were many lessons learned from this first set of test flights. The most important one is that more time and testing are needed for each step to deal with the inevitable problems. It is vital that these lessons be among the primary areas of study that will carry over from FD#1 to FD#2, which is currently scheduled for early FY05 at DFRC and will use a specially designed Ku-band phased array antenna for the Range User system. The next series of flight demonstrations scheduled for late 2004 at DFRC will incorporate many lessons learned from FD#1. A specially designed Ku-band phased array antenna will be used with the Range User system. A test flight on a hypersonic vehicle is planned by the end of 2006.

Demspm. Erol