Search NASA⌕ Search

Engineering topics

Valette, Matthieu

Publications and source records attributed to Valette, Matthieu.

Large radial shift experiments in RHIC and their implications for EIC design

The Hadron Storage Ring (HSR) in the future Electron-Ion Collider (EIC) must operate over a broad range of design circumferences. In 2018 preliminary beam studies on the circumference adjustment capabilities of the Relativistic Heavy Ion Collider (RHIC) were performed by applying a small momentum offset to the circulating bunches without adjusting any bending magnets. The off-momentum linear optics were corrected back to on-momentum conditions. Applying a similarly small deviation to the dipole fields of a select set of bending magnets provides a large radial shift over much of the RHIC (or HSR) circumference while leaving the design trajectory unchanged in the insertion regions. Here, this paper presents the design of the different lattice configurations foreseen as the most viable options for the required HSR circumference changes, and highlights the modifications necessary for regular operations and to allow for testing these new settings in RHIC. Experimental results from 2021 and 2022 are reviewed and compared to model predictions obtained from both MAD-X and Bmad. The implications of these results for HSR design are discussed.

43 PARTICLE ACCELERATORS↗

Installation and first operation of the International Fusion Materials Irradiation Facility injector at the Rokkasho site

The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injector has been fully sent to Japan. The re-assembly of the injector has been performed between March and May 2014. Then after the check-out phase, the production of the first proton beam occurred in November 2014. Hydrogen and deuteron beam commissioning is now in progress after having proceeded with the final tests on the entire injector equipment including high power diagnostics. This article reports the different phases of the injector installation pointing out the safety and security needs, as well as the first beam production results in Japan and chopper tests. Detailed operation and commissioning results (with H{sup +} and D{sup +} 100 keV beams) are reported in a second article.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗