Search NASA⌕ Search

Engineering topics

Van Dyke, Isabel K.

Publications and source records attributed to Van Dyke, Isabel K..

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗