Timing and Synchronization in the LLRF systems of the Fermilab PIP-II Linac

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

Varghese, Philip↗

Performance of PIP-II high-beta 650 cryomodule after transatlantic shipping

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

43 PARTICLE ACCELERATORS↗

The RF Protection Interlock System Prototype Verification

The Radio Frequency Protection Interlock system plays vital role in the LLRF related/dependent accelerator sections Protection. It’s main role is to collect information from number different sensors and indicators around nearest cavities and cryomodule and provide instant RF signal termination in case of safety thresholds violation. This submission describes newly designed RFPI system tailored to the Proton Improvement Plan II (PIP-II) requirements. The proof of concept prototype of this system has been build. The paper includes also the CMTF environment evaluation tests results and findings as an input to the next full-scope prototype design.

43 PARTICLE ACCELERATORS↗

Evaluation of the first version of the new RFPI system dedicated to PIP-II project accelerator

The Low-Level Radio Frequency (LLRF) control system is one of the most critical superconducting linac infrastructures responsible for the parameters of the beam acceleration. The LLRF system mainly focuses on the electromagnetic field parameters inside the cavity. While it incorporates fast feedback algorithms to optimize energy transfer to the passing particle beam it does not follow other cryomodule or cavity parameter changes. The Radio Frequency Protection Interlock (RFPI) system closely monitors various factors (like cryomodule vacuum, beamline vacuum, field emission probe current level, temperature, RF signal leakage, etc). Its simple but reliable logic has to provide an instant decision about the LLRF system or high-power amplifier output signal blocking in case of safety region excitation. This contribution presents a new version of the RFPI system which logic is implemented in the FPGA chip. The initial work on the prototype of the new system design resulted in the PoC (Proof of Concept) device. The PoC offers the possibility of various protection logic configurations, input signals parameters evaluation, and modularity aspects verification. The structure and test results from the device evaluation are summarized and discussed in this contribution.

43 PARTICLE ACCELERATORS↗

2001 Mars Odyssey Mission

This viewgraph presentation reviews the 2001 Mars Odyssey Mission. The contents include: 1) Mission Overview; 2) Current Scope of Work: 3) Facilities; 4) Critical Role of DSN; 5) Relay as Mission Supplement; 6) Current Mars Telecom Infrastructure; 7) PHX EDL Comm Overview; 8) EDL Geometry (Entry through Landing); 9) Phoenix Support; 10) Preparations for Phoenix; 11) EDL Support Timeline; 12) One Year Rolling Schedule; 13) E3 Rationale; and 14) Spacecraft Status.

Odyssey↗

Deep Space 1: Into the New Millennium

This paper presents Deep Space 1: Into the New Millennium in viewgraph form. The topics include: 1) NASA's New Millennium Program; 2) Deep Space 1 (DS1) Project Overview; 3) Technology/Science Payload; 4) Mission Objectives and Status; 5) Extended Mission Opportunities; and 6) Summary.

Varghese, Philip↗