Engineering topics
Vaughan, A. T.
Publications and source records attributed to Vaughan, A. T..
Dawn Maneuver Design Performance at Vesta
The Dawn spacecraft orbited the asteroid Vesta from July 16, 2011 to September 5, 2012, successfully accomplishing the four planned science orbits and two planned rotational characterization orbits. The lowest-altitude science orbit lasted four months, with 20 planned orbit maintenance maneuvers. Navigation results from Vesta demonstrate that the navigation plan was sufficient to achieve orbit delivery accuracy requirements. This paper compares the flown Dawn trajectory against the planned trajectory and expected maneuver dispersions. Understanding the effectiveness of the Vesta maneuver design plan is a key component of planning for operations at Ceres, the next destination for the Dawn mission.
Cassini Orbit Determination Results: January 2006 - End of Prime Mission
After the forty-fifth flyby of Titan, the Cassini spacecraft has successfully completed the planned four-year prime mission tour of the Saturnian system. This paper reports on the orbit determination performance of the Cassini spacecraft over two years spanning 2006 - 2008. In this time span, Cassini's orbit progressed through the magnetotail and pi-transfer phases of the mission. Thirty-four accurate close encounters of Titan, one close flyby of Iapetus and one 50 km flyby of Enceladus were performed during this period. The Iapetus and Enceladus flybys were especially challenging and so the orbit determination supporting these encounters will be discussed in more detail. This paper will show that in most cases orbit determination has exceeded the navigation requirements for targeting flybys and predicting science instrument pointing during these encounters.