Search NASASearch

Engineering topics

Veeramany, Arun

Publications and source records attributed to Veeramany, Arun.

Large-scale Hydrogen Storage Risk Assessment

This project investigated risks involved in deploying a large-scale hydrogen storage system at the Port of Seattle (hereafter, the Port) for its on-terminal and maritime applications in an urban industrial setting. Alongside, the project attempted to address some of the barriers to risk assessment such as need for an exact system design for a systematic investigation, direct access to surrounding communities to gauge their perceptions, and an integrated software required to undertake a full-fledged risk assessment. These barriers were overcome using illustrative reference station designs, engaging with community-facing agencies through Port support, and pooling national laboratory capabilities available for risk assessments. The project identified relevant public safety risk metrics, compared various hydrogen carriers, engaged with community-facing agencies, and explored potential gaps in existing safety codes and standards. The primary impacts of this project include the development of risk assessment guidance for ports and utilities, informing them of the trade-offs in the choice of hydrogen carriers, and the ability to increase public capacity for dialog and engagement. This paves the way toward decarbonization of the Port activities, bringing about awareness around jobs in the market for risk assessments, and the need to ramp up community engagement long before any hydrogen system deployment is undertaken.

08 HYDROGEN

Large-Scale Hydrogen Storage Cyber Risk Assessment

Hydrogen storage systems may become more widely deployed throughout the country, and so it is possible that individual and interconnected systems will be exposed to cyber-attacks. These events can cause physical and financial harm to employees, people in the vicinity of the facility, and the company that owns the facility. The two main ways bad actors may access information or control from a hydrogen storage facility are through information technology and operations technology devices, the former of which refers to data and information from networked devices and the latter of which refers to onsite controls for the physical system. Both types of entryways into the system should be considered when companies conduct cyber risk assessments and when regulators develop or revise relevant codes and standards. This report analyzes cybersecurity risks associated with a generic hydrogen storage system by outlining the system's purpose and the importance of its cybersecurity. The hydrogen storage system architecture and communication protocols are provided to understand potential cyber vulnerabilities. Later, an event tree analysis is performed on hydrogen operation to identify system weaknesses by outlining potential attack scenarios. This report also identifies critical cyber assets related to different hydrogen operations followed by an examination of potential threats, and the impact of cyber assets on those operational assets.

08 HYDROGEN

Large-Scale Hydrogen Storage Cyber Risk Assessment

Hydrogen storage systems are becoming more widely deployed throughout the country, and as their presence continues to grow, it is possible that individual and interconnected systems will be exposed to cyber-attacks. These events can cause physical and financial harm to employees, people in the vicinity, and to the company that owns the facility. The two main mechanisms malicious actors may access information or control from a hydrogen storage facility are through information technology and operations technology devices, the former of which refers to data and information from networked devices and the latter of which refers to onsite controls for the physical system. Both types of entryways into the system should be considered when facility managers conduct cyber risk assessments and when regulators develop or revise relevant codes and standards. This report analyzes cybersecurity risks applicable to a wide variety of hydrogen storage systems by outlining the system's purpose and the importance of its cybersecurity. The hydrogen storage system architecture and communication protocols are provided to understand potential cyber vulnerabilities. Later, an event tree analysis is performed on hydrogen operation to identify system weaknesses by outlining potential attack scenarios. This report also identifies critical cyber assets related to different hydrogen operations followed by an examination of potential threats, and the impact of cyber assets on those operational assets.

08 HYDROGEN

Wholesale Electricity Analysis via Simulation & Learning Experiments (WEASLE): Platform Development and Pilot Competition

This document reports the development of the Wholesale Electricity Analysis via Simulation and Learning Experiments (WEASLE) platform and the pilot competition that was conducted to test the platform. Due to the increasing reliance on variable renewable energy resources for bulk power, the pilot competition, called the Energy Storage Participation Algorithm Competition (ESPA-Comp), was used to test the effect of various market designs on storage utilization and market efficiency. Basic details of the platform are provided, including an overview of the market clearing engine, the battery dispatch and degradation models, electric grid topology and resource mix, and software architecture. Two market designs were tested: a two-settlement market analogous to typical ISO design today, and a multi-settlement market that allows additional forward-trading periods during the real-time market. Results from the pilot competition show that the storage bidding problem is nontrivial and is well suited for future challenges. We find that: 1) all four teams utilized different approaches to the bidding problem, 2) different methodological approaches led to substantially different offer behaviors, 3) resource profits are clustered by team and methodological approach, 4) simulated offers reduced market surplus by about 0.5%, 5) substantially different prices between two-settlement and multi-settlement markets albeit minimal difference in overall market surplus.

24 POWER TRANSMISSION AND DISTRIBUTION

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF

Hydrogen Transportation and Distributed Energy Systems Risk and Feasibility Assessment for Airport Facilities - CRADA 555 (Abstract)

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support PDX in performing a risk assessment for several hydrogen deployment scenarios. It is intended that the deployment of hydrogen at PDX could serve several roles, including decarbonizing its bus fleet and building out a distributed energy system which could also be used to facilitate emergency operations. PDX’s initial plans concern replacing their current fleet of 28 busses with FCEBs. To do so, PDX will need to deploy the hydrogen systems needed to support the buses. This includes hydrogen storage, production, delivery, filling, compression, and maintenance. PDX also has long range plans to build a distributed energy system to support normal and resilient operations. This study will investigate the risks of each plan individually, and a combined plan which serves both. Additionally, PDX is in an area with the potential for high seismic activity, as such this work will also include a seismic risk assessment. A detailed risk assessment using PDX as a test case is necessary to ensure the deployment of large-scale hydrogen is successful and to understand the benefits or drawbacks in contrast to electric only technologies. Many technologies have been proposed that claim to utilize hydrogen for both transportation and distributed energy systems; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for PDX will be analyzed, a risk assessment will be performed on the hydrogen infrastructure and distributed energy system. These assessments will be useful for understanding how each of these technologies would perform as applied to a large public facility and public safety. The results of this CRADA, and an impact of the DOE funding, will evaluate hydrogen as a key fuel for PDX and will accelerate by several years availability of hydrogen, fuel cells, and other low-carbon technologies.

08 HYDROGEN

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION