Search NASA⌕ Search

Engineering topics

Volpe, D

Publications and source records attributed to Volpe, D.

Tore Supra LH transmitter upgrade, a new RF driver for the power spectrum

New real time tools have been developed for testing new 700kW/3.7GHz/CW klystrons and for the operations on very long plasma shots. After the commissioning of the 18 series tubes on the high power test bed facility, the installation of the first 8 klystrons in the Tore Supra transmitter and the adjustment tests on load, this upgrade work has been materialized during the last 2010 campaign by a successful operation on the Full Active Multijunction (FAM) C3 antenna, with new performances: 3.5MW/40s on plasma. The RF output power control in amplitude and phase has been improved for a better control of the wave spectrum launched into the plasma. The new klystrons have no modulating anode and the high cathode voltage must be adjusted with the RF input power in order to optimize the RF output power with a minimization of the thermal power losses in the collector. A new phase correction, depending on the 3 RF output power ranges used, has been introduced. The improvements made in 2009 and 2010 on the generic phase loop and the procedures used during the real time tests of the RF transfer functions in amplitude and phase are detailed below. All RF measurements systems, RF safety systems and the RF calibration procedures have been revised in order to have the best consistency, reproducibility and with a measurement error against the calorimetry measurement lower than 10%.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of high power CW 3.7 GHz klystrons for fusion experiments on Tore Supra

In the frame of the CIMES project, a collaborative effort between Association Euratom-CEA and Thales Electron Devices (TED) has led to the development of a high power CW klystron TH 2103 C, working at 3.7 GHz, for plasma heating and current drive for the Tokamak Tore Supra. A prototype has been manufactured and thoroughly tested on water load in December 2007 to verify that all the parameters met the specifications. The paper will present in detail the process and results of the test of the klystrons.

43 PARTICLE ACCELERATORS↗

Validation of an ICRF ITER-Like Antenna on Tore Supra

A prototype of an ICRF antenna based on the load-resilient electrical layout foreseen for ITER has been built at CEA-Cadarache. It consists of a two resonant double loop (RDL) based on the conjugate-T concept proposed for the ITER ICRF array arranged toroidally in a close package. The antenna conditioning and commissioning have been successfully performed to validate the load resilience and the heating capability at the end of 2007. On Tore Supra despite unexciting ELMs, the load resilience studies have been conducted in L-mode by mean of slow variations of the plasma position and fast transient variations with both pellet injection and Supersonic Molecular Beam Injection (SMBI). The capability to maintain the RF power on the ITER-like antenna has been done successfully contrary to the classical ICRF antenna during the SMBI shots, in which the corresponding transient coupling resistance increased by a factor 3-4. In term of coupled power, a maximum power density of 6.6 MW/m2 is reached.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System

The upgraded 3.7 GHz Lower Hybrid Current Drive (LHCD) system for the Tore Supra (TS) tokamak is in the process of installation. When complete, it will permit long pulse injection (1000s) at coupled power level up to 6, 5 MW. Steady state operation of high power RF sources and components is challenging and requires careful validation before the system can be commissioned on the tokamak.Results on the validation of CW klystrons, improvements on the RF components forming part of the power generation circuit and the development of an RF water load to sustain CW pulses under 700 kW RF power are presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Tore Supra ITER like ICRF antenna prototype

In the framework of the ICRH development led at CEA Cadarache, a project of a prototype antenna based on the electrical layout foreseen for the ITER IC launcher has been initiated. First experiments have been performed on Tore Supra in 2004. Pulses of 500 kW lasting up to 6s have been achieved. The importance of the coupling effect between straps has been revealed during these experiments, and thus the need for an active control system of the current phasing between them. Despite the short experimental campaign terminated by the failure of the matching components due to undetected arcs, the load tolerant properties of such a circuit have been observed.Since, the prototype antenna has been repaired, reassembled and enhanced accordingly to the fruitful lessons harvested. The RF circuit was improved, corona rings were added on the capacitor poles and localized 'sharp' edges were rounded to increase the voltage standoff capability. To reduce the toroidal coupling between adjacent straps, a thick poloidal septum was added on the Faraday screen, thus easing the tuning of the launcher. Another major improvement was the development and the integration of current probes on each of the four straps. This paper reports on: the launcher mechanical enhancements, the recent results obtained in 2007 and the experimental program planned on Tore Supra.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ITER-Like Antenna electrical performance

The future integration on Tore Supra (TS) of the new Ion Cyclotron Heating (ICRH) ITER-like prototype antenna will be performed to achieve the final validation within plasma conditions. Along the few years of developments and electrical optimizations, this antenna went through series of thermo/mechanical and electrical tests. This paper presents the latest electrical results of the ITER Like antenna under vacuum condition inside the test bed. High RF power (60 kW) for 2 seconds pulses were performed, the paper present the first electrical performance results and focused on the experimental measurements of the current monitoring compared to electrical simulations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress in Arc Safety System Based on Harmonics Detection for ICRH Antennae

The arc detection systems based on harmonics detection have been tested n USA (TFTR, DIII, Alcator C-mod) and Germany (Asdex). These systems have some advantages in comparison with traditonal securities which use a threshold on the Vr/Vf (Reflected to Forward voltage ratio) calculation and are ITER relevant. On Tore Supra (TS) 3 systems have been built using this principle with some improvements and new features to increase the protection of the 3 ICRH generators and antennae. On JET 2 arc safety systems based on the TS principle wil also be used to mprove the JET ITER-like antenna safety. In order to have the maximum security level on the TS ICRH system, the 3 antennae are used with these systems during all plasma shots n redundancy with the other systems. This TS RF principle and ts electronic interactions with the VME control of the generator are described. The results on the TS ICRH transmitter feeding the 3 antennae are summarized and some typical signals are given.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗