CONSTRUCTION METHOD STUDY FOR INSTALLATION OF A LARGE RISER IN A SINGLE SHELL TANK
This study evaluates and identifies a construction method for cutting a hole in a single-shell tank dome. This study also identifies and evaluates vendors for performing the cut.
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗