Acceptance Testing of the Scorpius Sweep Magnet
A beam-dump magnet for Scorpius has been defined by LANL and designed and built by Radiabeam Technologies. Initial verification of the Radiabeam design used a magnetic field model provided by Radiabeam and analyzed by LANL tools during September 2021. Simulations indicated that the design was sufficient to meet deflection requirements to protect sensitive equipment in the case of a failed target. In January 2022, the magnet was fabricated and Radiabeam conducted measurements of the magnetic field as a function of position. The measurements deviate somewhat from the simulation. In particular, the peak magnetic field is 10-15% smaller in magnitude than expected from simulation. This note compares the magnetic field measurements to simulation and to measurements of the existing DARHT magnet, which was designed for the same purpose. We show a comparison of the measured beam deflection performance between Scorpius and DARHT and show updated results of LANL’s electron beam tracking code using the Scorpius measurements. Using field measurements we find that the DARHT magnet will deflect a 19.6 MeV electron beam by 46.6° and the Scorpius magnet will deflect by 44.6°. These results show that the as-built Scorpius magnet has met design requirements for beam deflection.