James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

Cryogenic testing of the James Webb Space Telescope (JWST) included center-of-curvature metrology of the 18-segment primary mirror (PM). The Center-of-Curvature Optical Assembly (COCOA) consisted of a multiple-wavelength interferometer, a reflective null, coarse and fine alignment systems, and two displacement measuring interferometer systems. The COCOA enabled alignment and phasing of the segments from millimeter-level errors down to the nanometer level. This paper describes the COCOA, the test setup, the testing performed, and the performance of the COCOA in aligning the PM segments and measuring the final PM wavefront error.

Hadaway, James

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 meters in diameter and consists of 18 hexagonal segments, each 1.5 meters point-to-point. Each segment has a 6 degree-of-freedom hexapod actuation system and a radius-of-curvature (ROC) actuation system. The full telescope was tested at its cryogenic operating temperature at Johnson Space Center (JSC) in 2017. This testing included center-of-curvature measurements of the PM wavefront error using the Center-of-Curvature Optical Assembly (COCOA), along with the Absolute Distance Meter Assembly (ADMA). The COCOA included an interferometer, a reflective null, an interferometer-null calibration system, coarse and fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer was used to enable alignment and phasing of the PM segments. By combining measurements at two laser wavelengths, synthetic wavelengths up to 15 millimeters could be achieved, allowing mirror segments with millimeter-level piston errors to be phased to the nanometer level. The ADMA was used to measure and set the spacing between the PM and the focus of the COCOA null (i.e., the PM center-of-curvature) for determination of the ROC. This paper describes the COCOA, the PM test setup, the testing performed, the test results, and the performance of the COCOA in aligning & phasing the PM segments and measuring the final PM wavefront error.

JWST

Performance of the Primary Mirror Center-of-Curvature Optical Metrology System during Cryogenic Testing of the JWST Pathfinder Telescope

The JWST primary mirror consists of 18 1.5 m hexagonal segments, each with 6-DoF and RoC adjustment. The telescope will be tested at its cryogenic operating temperature at Johnson Space Center. The testing will include center-of-curvature measurements of the PM, using the Center-of-Curvature Optical Assembly (COCOA) and the Absolute Distance Meter Assembly (ADMA). The performance of these metrology systems, including hardware, software, procedures, was assessed during two cryogenic tests at JSC, using the JWST Pathfinder telescope. This paper describes the test setup, the testing performed, and the resulting metrology system performance.

JWST

Performance of the Primary Mirror Center-of-curvature Optical Metrology System During Cryogenic Testing of the JWST Pathfinder Telescope

The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 m in diameter and consists of 18 hexagonal segments, each 1.5 m point-to-point. Each segment has a six degree-of-freedom hexapod actuation system and a radius-of-curvature (RoC) actuation system. The full telescope will be tested at its cryogenic operating temperature at Johnson Space Center. This testing will include center-of-curvature measurements of the PM, using the Center-of-Curvature Optical Assembly (COCOA) and the Absolute Distance Meter Assembly (ADMA). The COCOA includes an interferometer, a reflective null, an interferometer-null calibration system, coarse & fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer (MWIF) is used for alignment & phasing of the PM segments. The ADMA is used to measure, and set, the spacing between the PM and the focus of the COCOA null (i.e. the PM center-of-curvature) for determination of the ROC. The performance of these metrology systems was assessed during two cryogenic tests at JSC. This testing was performed using the JWST Pathfinder telescope, consisting mostly of engineering development & spare hardware. The Pathfinder PM consists of two spare segments. These tests provided the opportunity to assess how well the center-of-curvature optical metrology hardware, along with the software & procedures, performed using real JWST telescope hardware. This paper will describe the test setup, the testing performed, and the resulting metrology system performance. The knowledge gained and the lessons learned during this testing will be of great benefit to the accurate & efficient cryogenic testing of the JWST flight telescope.

optical testing

The Alignment Test System for AXAF-I's High Resolution Mirror Assembly

The AXAF-1 High Resolution Mirror Assembly (HRMA) consists of four nested mirror pairs of Wolter Type-1 grazing incidence optics. The HRMA assembly and alignment will take place in a vibration-isolated, cleanliness class 100, 18 meter high tower at an Eastman Kodak Company facility in Rochester, NY. Each mirror pair must be aligned such that its image is coma-free, and the four pairs must be aligned such that their images are coincident. In addition, both the HRMA optical axis and focal point must be precisely known with respect to physical references on the HRMA. The alignment of the HRMA mirrors is measured by the HRMA Alignment Test System (HATS), which is an integral part of the tower facility. The HATS is configured as a double-pass, autocollimating Hartmann test where each mirror aperture is scanned to determine the state of alignment. This paper will describe the design and operation of the HATS.

Waldman, Mark