Weather impacts on solar PV operations summary of the current body of knowledge and implications for further investigation

There is growing concern that severe weather events are negatively affecting solar photovoltaic (PV) systems and pose ongoing and unrecognized risks. Clearly research is needed to quantify and characterize the risks so that properly calibrated improvements can be implemented. To begin this process, this report is a collection of information of severe weather impacts on solar PV available today taken from research, insurance data, and field inspections. While it is not comprehensive enough to draw conclusions, this information provides a baseline for action and indicates an urgent need to investigate further.

14 SOLAR ENERGY↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

Performance Index Assessment for the PV Fleet Performance Data Initiative

We report on 250 PV systems throughout the United States, comprising 157 MWdc of system capacity and more than 10,000 monthly performance index (PI) values. Loss factors were isolated including first-year start-up issues, snowfall, soiling and inverter downtime. Inverter availability was found to contribute significant system energy loss during the first six months of operation, with an average of 8% loss occurring during this period, and 2.3% on average thereafter. Other start-up issues beyond inverter downtime, such as partial string outage, contributed additional underperformance in the first year of operation across the fleet. Winter performance was also found to be below summer performance on average, likely due to snowfall. A relationship was found between monthly snowfall accumulation in centimeters and monthly under-performance, indicating a 6%-40% loss in months with measured snowfall, depending on climate. After correcting for availability, snow and startup loss, over 90% of systems were performing within 10% of monthly expectation based on satellite resource data and PVWatts production estimates.

loss factors↗

Masking of photovoltaic system performance problems by inverter clipping and other design and operational practices

We describe how performance problems can be “masked,” or not readily evident by several causes: by photovoltaic (PV) system configuration (such as the size of the PV array capacity relative to the size of the inverter and the resultant clipped operating mode); by instrumentation design, installation, and maintenance (such as a misaligned or dirty pyranometer); by contract clauses (when operational availability is transformed to contractual availability, which excludes many factors); and by identified management and operational practices (such as reporting on a portfolio of plants rather than individually). A simple method based on a duration curve is introduced to overcome shortcomings of Performance Ratio based on nameplate capacity and Performance Index based on hourly simulation when quantifying masking effects, and inverter clipping and pyranometer soiling are presented as two examples of the new method. With a better understanding of the non-transparency of masking issues, stakeholders can better interpret performance data and deliver improved AC and DC plant conditions through PV system operation and maintenance (O&M) for improved performance, reduced O&M costs, and a more consistently delivered, and reduced, levelized cost of energy (LCOE).

14 SOLAR ENERGY↗

Cybersecurity in Photovoltaic Plant Operations

This paper provides practical information for PV plant operators regarding cybersecurity. Plans to integrate photovoltaic generation into utility systems requires that cybersecurity be considered in every aspect- from customer data to business information to plant monitoring and control operations. This paper describes the types of threats encountered in operation of PV plants; challenges faced by photovoltaic plant operators in implementing cybersecurity; cybersecurity standards that apply to photovoltaic plant operations; cybersecurity response plans and recommended best practices to ensure photovoltaic plant cybersecurity.

14 SOLAR ENERGY↗

REopt Lite User Manual

REopt Lite evaluates the economic viability of grid-connected solar photovoltaics, wind, combined heat and power, and electric and thermal storage at commercial and small industrial sites. It allows building owners to identify the system sizes and dispatch strategies that minimize the site’s life cycle cost of energy. REopt Lite also estimates the amount of time on-site generation and storage can sustain the site's critical load during a grid outage and allows the user the choice of optimizing for energy resilience. It is primarily used to inform project development decisions and to support research on the factors that drive project feasibility for market development and policy analysis. It is available through a web interface, application programing interface, and open-source code. This user manual provides an overview of the model, including its capabilities and typical applications; inputs and outputs; economic calculations; technology descriptions; and model parameters, variables, and equations. The model is highly flexible and is continually evolving to meet the needs of each analysis. Therefore, this report is not an exhaustive description of all capabilities, but rather a summary of the core components of the model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

PV Fleet Performance Data Initiative: Performance Index-Based Analysis

In this analysis, we report on 250 PV systems throughout the US, comprising 157 MWdc of system capacity and over 10,000 monthly PI values based on high-frequency (subhourly) energy data and satellite-based resource data. The distribution of PI values is analyzed, and multiple causes of underperformance are assessed, including first-year startup issues, snowfall and inverter downtime. An initial distribution of raw monthly PI values was collected with mean measured / modeled performance of PI = 0.935. After correcting for the three identifiable loss factors mentioned above, an average monthly performance of PI = 0.994 was obtained, with a distribution closely following a Gumbel Extreme Value distribution. In particular, inverter availability was found to contribute a system energy loss of 2.3% on average, except in the first six months of operation when availability losses are closer to 8%. Other startup issues beyond inverter downtime such as partial string outage contributed an additional 5% underperformance in the first year of operation across the fleet. Winter performance was also found to be 5%-10% below summer performance on average, likely due to snowfall. A simple linear relationship was found between snow loss and monthly snowfall accumulation in cm, indicating between 6% - 40% loss in months with nonzero snowfall, depending on climate.

14 SOLAR ENERGY↗

Insurance in the Operation of Photovoltaic Plants

This paper provides an overview of property and casualty insurance industry functions, insurance terminology descriptions, and special insurance coverage considerations for photovoltaic (PV) system owners, asset managers, operators, PV operation-and-maintenance service providers, utilities, and other parties. The paper includes the results of an analysis of 6 years of property and casualty insurance claims for PV equipment and discusses considerations for purchasing property and casualty insurance for owners and operators of PV systems. PV is a relatively new asset type, and insurance companies are revisiting rates and offerings as actuarial data become available. This paper seeks to inform decisions that optimize the balance of the cost of insurance with enabling benefits to finance, permitting, utility connections, and the operation of PV plants.

14 SOLAR ENERGY↗

PV O&M Cost Model [SWR-21-14]

This tool presents a method for calculating costs associated with the operation and maintenance (O&M) of photovoltaic (PV) systems. The tool compiles details regarding the cost and frequency of multiple O&M services to estimate annual O&M costs ($/year) for each year of an analysis period, the net present value ($) of life cycle costs accumulated over the analysis period, and the reserve account amount ($) that might be required to fund unexpected repairs. The reserve account includes parts inventory and is important for providing a source of funds to make repairs quickly and avoid lost production. This method allows a detailed selection of services to perform based on system size, market served (e.g., residential, commercial, or utility), type and configuration of system components (e.g., micro-, string, or central inverter), and site and environmental conditions (e.g., pollen, bird populations) which is an improvement over simple per unit valuations of O&M costs ($/kW/year). This model also distinguishes costs that vary from year to year and increase at different rates over time as modeled by heuristic failure distributions (e.g., Weibull or Lognormal distribution) based on actuarial data for many of the services.

Walker, Andy↗

Moving the Mission Forward with Renewable Energy

Presentation gives an overview of proven examples of renewable energy technologies. Learn how to properly utilize renewable energy technologies; research, select, fund, and deploy renewable technologies; best operate and maintain the federal government’s fleet of on-site solar photovoltaic (PV) systems; and learn best practices to detect and address performance issues with a PV system.

distributed energy↗

REopt: Energy Decision Analysis

REopt transforms complex energy project decisions into actionable results for building owners, utilities, and industry. Based on decades of NREL decision-support expertise, REopt guides investment in economic, resilient energy technologies. This presentation provides an overview of how REopt can help building owners, utilities, developers, and industry optimize the economic and resilience benefits of distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SIDSIM (Sub-Interval Distribution-function in Simulation) [SWR-17-22]

Time-series simulation is a technique used to estimate the energy delivery of a power generation system with output that changes under changing conditions. Such variable resources include photovoltaic energy systems that experience different levels of sunlight or wind farms with changing wind patterns. As distributed generation from these variable resources continues to flourish, having improved software tools to accurately measure, model, and estimate phenomena of interest to grid integration, in addition to energy output, will be crucial for safeguarding smooth integration and operation of these energy systems. Currently, time-series simulations assume conditions and power output are constant over the duration of a time-step (steady-state assumption). NREL researchers improve the accuracy with a new simulation software called SIDSIM (Sub-Interval Distribution Simulation) that replaces this steady value (solar or wind resource) with a distribution function that has a maximum value, a minimum value, and a shape to the curve within each time-step. The distribution function used for modeling varying values in the SIDSIM software is a novel equation and presents advantageous new benefits over the conventional methods. The first advantage comes in the ability to determine maximum instantaneous power within a time-step. This enables better protection of a system from overcurrent issues and it also allows for better forecasting and reservation of transmission capacity; such capabilities are essential for energy system integration. Second, a distribution function helps to determine the amount of energy loss due to “clipping” in cases where the photovoltaic direct current (DC) system capacity exceeds the inverter capacity, the AC interconnect capacity, or any other limiting component or threshold value. It improves estimates of battery throughput by allowing both charge and discharge of a battery within the duration of a time-step. Third, it provides a more refined estimate of utility-bill impacts by considering the delivered power may be higher than the site load or lower than the regular average power estimates that are made using a quasi-steady-state assumption. SEE ALSO OSTI ID 1,361,018

Walker, Andy↗

SIDSIM (Sub-Interval Distribution Simulation) [SWR-17-22]

This software is based on a distribution function to represent a variable value over a time-step in time-series simulation of a photovoltaic or wind system, with application to other types of variable-output generator such as wave power. This invention offers important benefits over prior art. Prior art assumes a constant value for each parameter over the duration of each time-step. The form of the distribution function is determined by a maximum value (kW), a minimum value (kW) and energy (kWh) for each time step, and integration of this distribution function provides information such as energy in excess of some threshold (inverter capacity, interconnect capacity, on-site load, etc) and energy delivered under any such specified threshold. Results such as maximum power that can be exported from a distributed generation system are determined and very important for energy systems integration.

Walker, Andy↗