Commissioning Guidance for Energy Savings Performance Contracts (ESPCs)

This Commissioning Guidance for Energy Savings Performance Contracts (ESPCs) is DOE’s official guidance for ordering agencies under the current DOE ESPC IDIQ contract. This guidance document explains how commissioning of energy conservation measures (ECMs) and water conservation measures (WCMs) is incorporated into the ESPC process, roles and responsibilities in project commissioning, and key elements of commissioning. This document updates the previous version, released in 2015. This guidance can also be used as applicable in the development of ESPC ENABLE and UESC performance assurance plans.

Walker, Christine↗

Recognizing and Assigning Risks and Responsibilities Using the Risk, Responsibility, and Performance (RRP) Matrix

The Risk, Responsibility, and Performance Matrix (RRP Matrix) is the energy savings performance contract (ESPC) document that focuses on 16 areas of risks and responsibilities in an ESPC project. The RRP Matrix summarizes and documents the contractor (energy service company, i.e., ESCO) and ordering agency’s agreements about allocating risks and responsibilities – to the ESCO, to the ordering agency, or shared. Ordering agencies and ESCOs should be mindful, however, that the ESCO remains responsible for achieving energy savings guaranteed under the ESPC, notwithstanding the allocations of risks, responsibilities, and performance.

Walker, Christine↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Recommended vs. Actual Escalation Rates For ESPCs: Is the Guidance Good?

Escalation rates applied to the savings from energy savings performance contracts (ESPCs) and related financed energy projects play a large role in their scope and costs. The U.S. Department of Energy’sFederal Energy Management Program (FEMP) employs the National Institute of Standards and Technology (NIST) to package projections of real (uninflated) energy prices and general inflation forecasts developed by two other federal government entities. The main output from this exercise is NIST’s Energy Escalation Rate Calculator (EERC), which is strongly recommended by FEMP for use in performance contracts and relied on by federal agencies and others conducting performance contracts as an objective source for their projects’ escalation rates. This study investigated whether the rates prescribed by EERC (and a coarser NIST tool that preceded it) have provided users with estimates that approximate actual changes in energy prices over the years. The results are encouraging: the NIST tools slightly under-estimated actual electricity prices and somewhat over-estimated those for natural gas. Concern regarding the latter is mitigated, however, because a) it is seen as due primarily to the increasing surplus of natural gas from the “fracking revolution” in the 2010s, and b) natural gas savings were found to account for only 14.4% of the total savings from the largest population of federal ESPCs (FEMP’s indefinite quantity ESPC contract, representing roughly 430 projects), compared to almost four times that (56.8%) for electricity savings. Consequently, reliance on EERC appears to be a sound policy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗