First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

SuperKEKB beam final focus superconducting magnet system

The SuperKEKB was designed and constructed as the upgraded accelerator of KEKB. In this accelerator design, the nano-beam scheme of collision was applied and a luminosity of 8 x10 35 cm -2 s -1 was targeted. In the design, the beam final focus system was the key component in the accelerator hardware elements. This final focus system consists of 55 superconducting magnets. In this paper, the designs of the magnets, the cryostats and the cryogenic system are shown, and the field measurement results are reported. The SuperKEKB beam operation with the final focus system started on 2018 March 19, and the magnet quench events up to 2020 December 16 are described.

43 PARTICLE ACCELERATORS↗