Search NASA⌕ Search

Engineering topics

Wanderer, Peter

Publications and source records attributed to Wanderer, Peter.

At least 19 records

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗

High precision magnetic field measurement and mapping of the LEReC 180 degree bending magnet using very low field NMR with hall combined probe (140 - 350 gauss)

The Relativistic Heavy Ion Collider (RHIC) at BNL are using the Low Energy RHIC Electron Cooling (LEReC) to conduct experiments that search for the quantum chromodynamic (QCD) critical point. The first ever electron cooling based on the RF acceleration of electron beams was experimentally demonstrated on April 5, 2019 at LEReC at BNL. The first critical step in obtaining successful 3D non-magnetized cooling of the Au ion bunches in the RHIC cooling section was matching the electron beam energy with a relative error less than 5*10 -4 to the ion beam energy. Part of the LEReC beamline is a dipole magnet that bends the electron beam 180 degree. One of the most outstanding measurement challenges is that the dipole field is so low (≈200 G). Most of the existing NMR probes can only measure fields >400 G. Lower signal-to-noise ratio at low fields is requires the use of larger sample volumes. Working with CAYLAR, a NMR probe has been redesigned and optimized for these low field measurements with high resolution. We report the methods, challenges, and results for extensive magnetic field mappings of the 180 dipole magnet. A combination of NMR and Hall sensors has been successfully implemented to measure uniform field regimes inside the magnet center area and non-uniform field regimes at the magnet ends. Detailed measurement and mapping have been performed at five radii and five heights along the beam trajectory. Meanwhile a finite element magnetic modeling simulation of the magnet using Opera software has been performed. The calculated and measured data are compared, and the calculated data is good reference for measured data over long length mapping from magnet edge to center. The measured magnetic measurement data is directly useful for beam instrumentation, diagnostics and operation.

Magnetic Field Measurement↗

HTS Dipole Prototype Magnet for NSLS X13A Endstation

This article reports the design, three-dimensional magnetostatic simulation results, coil fabrication, assembly, and low-temperature test results of a C-frame, iron-dominated high-temperature superconductor dipole magnet for ultra high vacuum magnetic-sensitive spectroscopy techniques at the National Synchrotron Light Source (NSLS) at Brookhaven National Laboratory. The magnet is required to provide fields up to ~1 T along two spatial directions. With an added capability to rotate about its vertical axis of symmetry, the magnet system is capable of delivering field along all three principal axes. The combination of this magnet and fast-switched, elliptically polarized soft X-rays produced by the NSLS elliptically polarized wiggler forms the basis for an excellent tool for polarization-sensitive studies of magnetic materials. The prototype magnet consists of a set of pancake coils fabricated from BSCCO tape reinforced with stainless steel. Those pancake coils are clamped in a low-carbon AISI 1006 grade steel pole and yoke assembly. For testing purposes, a cold He gas environment provided cooling the superconducting magnet to subtransition temperatures; for operation in an ultra high vacuum endstation environment, cooling can be provided by an external cryocooler. The low-temperature tests establish the safe-operating parameters needed to achieve the target magnetic field values. The measured magnetic field values are in close agreement with the magnetic simulation results, thereby confirming that the magnet design fulfills the performance requirements. Here, the final section of this article lists some suggestions to improve the magnet performance.

36 MATERIALS SCIENCE↗

Vertical Magnetic Measurements of the First Full-Length Prototype MQXFAP2 Quadrupole for the LHC Hi-Lumi Accelerator Upgrade Project

This paper reports the commissioning of the vertical magnetic measurement system and the room temperature (warm) and cryogenic (cold) magnetic field measurements of the first full-length (4.2 m) quadrupole built by the U.S. Accelerator Upgrade Project (AUP) (formerly the LARP collaboration) for the high luminosity upgrade of the Large Hadron Collider at CERN. The magnet, designated MQXFAP2, is a prototype preceding production for the AUP which will provide ten sets of 8.4-m superconducting insertion region quadrupoles for the Hi-Lumi Upgrade. The quadrupoles will be built by assembling two 4.2-m magnets in a single cryostat. Agreement between Brookhaven National Laboratory's (BNL's) and Lawrence Berkeley National Laboratory's (LBNL's) warm measurement data has indicated that the upgraded vertical magnetic measurement system at Brookhaven National Laboratory is ready for MQXFA magnet production testing. Lastly, the cold magnetic measurement has been performed and preliminary data analysis has been conducted.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of Nb$_3$Sn Accelerator Magnet Training

Nb 3 Sn accelerator magnet technology has made significant progress during the past decades. For the first time, it is planned to be used in a real accelerator. A relatively small number of Nb 3 Sn quadrupoles and dipoles will be installed in the LHC to increase machine luminosity. Although it will prove the possibility of using Nb 3 Sn magnets in real machines, many questions of scaling this technology up remain. One of them is related to slow training of Nb 3 Sn magnets compared to the traditional Nb-Ti accelerator magnets. Since the goal is to operate thousands of Nb 3 Sn magnets in a future post-LHC accelerator, the slow training will affect both the practical design margin and the nominal operation field. Consequently, the cost of the project to reach the design field level is also increased. Furthermore, to improve our understanding of slow magnet training the existing Fermilab data from Nb 3 Sn magnet tests were re-analyzed. A summary of coil training features and correlations with fabrication parameters observed is presented in this paper.

43 PARTICLE ACCELERATORS↗

Analysis of the short to-ground event in the LARP-AUP MQXFAP1 magnet, and its implication on the production and tests of the series magnets

Starting from 2022, the Large Hadron Collider (LHC) at CERN will be shut down to increase the luminosity of the machine. One of the main interventions will be inserting more performing low-β quadrupoles, called MQXF, in the interaction points. The US is involved in this activity with the US HL-LHC Accelerator Upgrade Project (AUP), and is responsible of the production and test of the Q1 and Q3 cryo-assemblies (each one containing two 4.2-m magnets in a single cold mass) of the triplet. After completing the US short model phase, the prototyping phase has started with MQXFAP1 (1st prototype, 4m long) test at the Brookhaven National Laboratory vertical test facility. However, after the magnet reached nominal current, a short-to-ground event stopped the test when the magnet was at 97.5% of acceptance current. In this paper, an analysis of this event is presented. We present how the short event can be modeled, and we base our conclusions on simulations and experimental evidence, trying to explain the mechanism that led to the shortto- ground formation. The short-to-ground has occurred in a coil that was known to have a previous coil-to-heater short. Therefore, we explain the connection between these two events, the possible risks for the future magnets, and how to prevent this issue from happening again in the series magnets.

43 PARTICLE ACCELERATORS↗

A Hybrid HTS/LTS Superconductor Design for High-Field Accelerator Magnets (Final Report)

This paper presents the design, construction, and test results of a hybrid dipole magnet. The inner coils were of second generation (2G) high-temperature superconductor (HTS) ReBCO tape and the outer coils were of low-temperature superconductor (LTS) Nb 3 Sn Rutherford cable. The HTS and LTS coils were independently powered and protected using different power supplies. The HTS coils were quenched many times with no degradation in performance observed. The hybrid field reached ~8.6 T, which is believed to be a record for a hybrid dipole. The maximum field was limited by the stable operation of the leads in the LTS coil at 8000 A. The HTS coils were independently ramped to 800 A, and the LTS coils to 10,000 A. With improved leads and instrumentation, this hybrid dipole is expected to produce over 13 T when the ReBCO tape in the HTS coil is aligned nearly parallel to the field. One major purpose of this program was to perform magnetization studies in the coils made with the HTS tape. Magnetization-induced field errors are expected to be small when the field is nearly parallel to the wide face of the tape. The magnetization measurements were performed at 77 K with the two racetrack coils in two orientations, with field predominantly either parallel or perpendicular to the wide face of the HTS tape. In addition, measurements were also performed at 4 K in different background fields provided by the outer Nb3Sn coils. This paper will summarize the magnetization measurements and present the quenching experience of the HTS coils in this hybrid magnet system.

99 GENERAL AND MISCELLANEOUS↗

Analysis of the short-to-ground event in the LARP-AUP MQXFAP1 magnet, and its implication on the production and tests of the series magnets

Starting from 2022, the Large Hadron Collider (LHC) at CERN will be shut down to increase the luminosity of the machine. One of the main interventions will be inserting more performing low-β quadrupoles, called MQXF, in the interaction points. The US is involved in this activity with the US HL-LHC Accelerator Upgrade Project (AUP), and is responsible of the production and test of the Q1 and Q3 cryo-assemblies (each one containing two 4.2-m magnets in a single cold mass) of the triplet. After completing the US short model phase, the prototyping phase has started with MQXFAP1 (1st prototype, 4m long) test at the Brookhaven National Laboratory vertical test facility. However, after the magnet reached nominal current, a short-to-ground event stopped the test when the magnet was at 97.5% of acceptance current. In this paper, an analysis of this event is presented. We present how the short event can be modeled, and we base our conclusions on simulations and experimental evidence, trying to explain the mechanism that led to the short-to-ground formation. The short-to-ground has occurred in a coil that was known to have a previous coil-to-heater short. Therefore, we explain the connection between these two events, the possible risks for the future magnets, and how to prevent this issue from happening again in the series magnets.

43 PARTICLE ACCELERATORS↗

Summary of Test Results of MQXFS1—The First Short Model 150 mm Aperture Nb 3 Sn Quadrupole for the High-Luminosity LHC Upgrade

The development of Nb 3 Sn quadrupole magnets for the High-Luminosity LHC upgrade is a joint venture between the US LHC Accelerator Research Program (LARP)* and CERN with the goal of fabricating large aperture quadrupoles for the LHC interaction regions (IR). The inner triplet (low-β) NbTi quadrupoles in the IR will be replaced by the stronger Nb3Sn magnets boosting the LHC program of having 10-fold increase in integrated luminosity after the foreseen upgrades. Previously, LARP conducted successful tests of short and long models with up to 120 mm aperture. The first short 150 mm aperture quadrupole model MQXFS1 was assembled with coils fabricated by both CERN and LARP. The magnet demonstrated a strong performance at Fermilab's vertical magnet test facility reaching the LHC operating limits. This paper presents the latest results from MQXFS1 tests with changed prestress levels. The overall magnet performance, including quench training and memory, ramp rate, and temperature dependence, is also summarized.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Fabrication of First 4-m Coils for the LARP MQXFA Quadrupole and Assembly in Mirror Structure

The US LHC Accelerator Research Program is constructing prototype interaction region quadrupoles as part of the US in-kind contribution to the Hi-Lumi LHC project. The low-beta MQXFA Q1/Q3 coils have a 4-m length and a 150 mm bore. The design is first validated on short, one meter models (MQXFS) developed as part of the longstanding Nb3Sn quadrupole R&D by LARP in collaboration with CERN. In parallel, facilities and tooling are being developed and refined at BNL, LBNL, and FNAL to enable long coil production, assembly, and cold testing. Long length scale-up is based on the experience from the LARP 90 mm aperture (TQ-LQ) and 120 mm aperture (HQ and Long HQ) programs. A 4-m long MQXF practice coil was fabricated, water jet cut and analyzed to verify procedures, parts, and tooling. In parallel, the first complete prototype coil (QXFP01a) was fabricated and assembled in a long magnetic mirror, MQXFPM1, to provide early feedback on coil design and fabrication following the successful experience of previous LARP mirror tests.

43 PARTICLE ACCELERATORS↗

Performance of the First Short Model 150-mm-Aperture Nb3Sn Quadrupole MQXFS for the High-Luminosity LHC Upgrade

LHC Accelerator Research Program (LARP) and CERN combined their efforts in developing Nb3Sn magnets for the high-luminosity LHC upgrade. The ultimate goal of this collaboration is to fabricate large aperture Nb 3Sn quadrupoles for the LHC interaction regions. These magnets will replace the present 70-mm-Aperture NbTi quadrupole triplets for expected increase of the LHC peak luminosity up to 5 × 10 34 cm -2 s -1 or more. Over the past decade, LARP successfully fabricated and tested short and long models of 90 and 120-mm-Aperture Nb3Sn quadrupoles. Recently, the first short model of 150-mm-diameter quadrupole MQXFS was built with coils fabricated both by LARP and CERN. The magnet performance was tested at Fermilab's vertical magnet test facility. Here, this paper reports the test results, including the quench training at 1.9 K, ramp rate and temperature dependence, as well as protection heater studies.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R&D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

Brookhaven-Built Magnet Will Catch Subatomic Debris

Peter Wanderer, head of Brookhaven's Superconducting Magnet Division, describes the magnet that's being built for the Facility for Rare Isotope Beams at Michigan State University

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Assembly and Test of a 120 mm Bore 15 T Nb(3)Sn Quadrupole for the LHC Upgrade

In support of the Large Hadron Collider (LHC) luminosity upgrade, the US LHC Accelerator Research Program (LARP) has been developing a 1-meter long, 120 mm bore Nb$_3$Sn IR quadrupole magnet (HQ). With a design short sample gradient of 219 T/m at 1.9 K and a peak field approaching 15 T, one of the main challenges of this magnet is to provide appropriate mechanical support to the coils. Compared to the previous LARP Technology Quadrupole and Long Quadrupole magnets, the purpose of HQ is also to demonstrate accelerator quality features such as alignment and cooling. So far, 8 HQ coils have been fabricated and 4 of them have been assembled and tested in HQ01a. This paper presents the mechanical assembly and test results of HQ01a.

43 PARTICLE ACCELERATORS↗

Test Results of LARP 3.6 m Nb3Sn Racetrack Coils Support by Full-length and Segmented Shell Structures

As part of the LHC Accelerator Research Program (LARP) to build a high performance quadrupole magnet with Nb{sub 3}Sn conductor, a pair of 3.6 m-long Nb{sub 3}Sn racetrack coils has been made at Brookhaven National Laboratory (BNL) and installed in two shell-type support structures built by Lawrence Berkeley National Laboratory (LBL). These magnet assemblies have been tested at 4.5 K at BNL to gauge the effect of extended length and prestress on the mechanical performance of the long structure compared to earlier short models. This paper presents the results of quench testing and compares the overall performance of the two versions of the support structure. We also summarize the shell strain measurements and discuss the variation of quench current with ramp rate.

43 PARTICLE ACCELERATORS↗