Search NASASearch

Engineering topics

Warren, S.

Publications and source records attributed to Warren, S..

Providing the Nation a Significant "High-Test Peroxide" Propulsion Test Capability

Renewed interest in high-test peroxide, as a propellant, required the development of a facility capable of testing rocket propulsion systems. The development of this capability at the NASA Stennis Space Center (SSC), MS, focused on meeting this requirement. The challenges, accomplishments, and lessons learned associated with developing the SSC E3 Test Facility's high-test peroxide capability are presented herein.

Bruce, R.

Ionizing radiation

The penetrating ionizing space radiations are found to be extremely diverse in the energy range of both their particulate and their electromagnetic components. Radiation terms and measures and ionizing radiation classes and sources are presented. Whole body radiation effects are examined, including radiation intensity and rate effectiveness factors. Radiation effects on specific body systems, such as blood, skin, visual, and reproductive systems are also discussed.

Warren, S.

Developments in space medicine.

The principal directions and results of space medicine studies are reviewed, starting with the early 1950s. The effects of prolonged inaction, a gravity-free environment, and isolation on the survival and functioning of man in space are examined. Quarantine and other measures developed to guard the health of astronauts during space missions are described. Space radiation hazards and means of overcoming them are discussed. The development of exobiology as a new field of science from our increasing knowledge of the universe is noted, together with some technological and medical advances resulting from space research.

Warren, S.

Solid rocket motor cost model

A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

Harney, A. G.