Search NASA⌕ Search

Engineering topics

Wei, Jie

Publications and source records attributed to Wei, Jie.

The High Rigidity Spectrometer at the FRIB: Magnet Development Status

This paper presents the 2025 progress of the High Rigidity Spectrometer (HRS) project at the Facility for Rare Isotope Beams (FRIB). We report on the construction and testing of the first-article HRS-High Transmission BeamLine (HTBL) magnets. An HTBL dipole magnet has successfully completed cold testing, achieving full magnetic performance without quenching, and is now ready for field mapping at FRIBs offline test bench. HTBL quadrupole triplet coils have been fabricated and tested, with all coils reaching their design currents, some following initial training quenches. Furthermore, the preliminary design of the large-scale, large-aperture SPectrometer Section (SPS) magnets has progressed to determine the baseline of the downstream HRS-SPS subproject in 2025. This includes the introduction of novel magnet designs, such as the sweeper dipole magnet, the sector dipole magnet, and iron-free coil-dominated quadrupole magnets, representing a significant scale breakthrough and a first for FRIB.

Choi, Yoonhyuck↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Experimental Demonstration of the Thin-Film Liquid-Metal Jet as a Charge Stripper

For high-power heavy ion accelerators, the development of a suitable charge stripper, which can handle intense beams, is essential. This Letter describes the first experimental demonstration of a heavy ion liquid lithium charge stripper. A 10–20 μm thick liquid lithium jet flowing at >50 m/s was formed and confirmed stable when bombarded by various heavy ion beams, while increasing the charge state of the incoming beams to the desired charge state range. Finally, this demonstration proved the existing power limitation with the conventional strippers can be overcome by the liquid-metal stripper, opening completely new possibilities in high-power accelerator development.

43 PARTICLE ACCELERATORS↗