Workshop Summary Report on Conduit Hydropower Development in the US – Opportunity and Challenges
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Wells, Jeremy.
Explore the source record for details and available documents.
The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.
This report provides a cost analysis of potential hydropower development for representative non-powered dam (NPD) sites in the United States. The overarching objective is to support the establishment of a basis for evaluating progress towards improving the competitiveness of new hydropower development for electricity generation. The representative sites, herein referred to as “reference sites”, were selected from sites with detailed water resource data to support the cost analysis. Facility designs, capital costs, plant generation and efficiency profiles, capacity factors, and levelized costs of energy (LCOE) are presented for the sites under baseline and near-term innovation cases. The baseline case represents facility configurations using technologies that are already widely applied in the hydropower industry, whereas near-term innovations are technologies likely to reach wide acceptance within the next 5 to 10 years. Cost savings in the near-term relative to the baseline are discussed to illustrate the potential benefits to the hydropower industry from research and development (R&D) and adoption of these innovations. Medium- to long-term innovation options expected from ongoing private and government R&D efforts are also highlighted but are not quantified in this report because of a current lack of complete information on these options. The key findings of the cost analysis in this study imply that near-term innovations could reduce the baseline costs of hydropower development at US NPD sites. Thus, if remaining R&D issues with these near-term innovations can be resolved within the next 5 to 10 years, industry-wide adoption of these technologies and improved competitiveness of NPD hydropower development can be expected. Specific key findings of the analysis include the following: 1) Potential installed capacity at the NPD sites evaluated in this study vary from 200 kW to 70 MW, representing two orders of magnitude variation across nearly 20 sites; 2) Capital costs, not including development costs, for the sites evaluated in this study vary from $2,200/kW to $34,000/kW but are below $12,000/kW for most sites; 3) Baseline LCOE estimates for lake dams are from $79/MWh to $790/MWh with most sites under $400/MWh, whereas estimates for lock dams are from $134/MWh to $289/MWh with most sites under $200/MWh; 4) Reductions in capital cost per kilowatt under the near-term innovation case are from −77% to −14% for lake dams and −21% to −2.1% for lock dams (excluding one site with a 14% increase in per-kilowatt capital costs); 5) Combined changes in capital costs and capacity factors in the near-term case relative to the baseline lead to reductions in LCOE of −71% to −14% for lake dams and −21% to −14% for lock dams; 6) Overall, LCOE reductions lead to 8 of the 18 sites under the near-term case having LCOE values below $150/MWh compared with only 2 of 18 sites in the baseline case.