Search NASA⌕ Search

Engineering topics

Westferro, F.

Publications and source records attributed to Westferro, F..

PRELIMINARY TEST RESULTS OF A PROTOTYPE FAST KICKER FOR APS MBA UPGRADE

The APS multi-bend achromatic (MBA) upgrade storage ring plans to support two bunch fill patterns: a 48-bunch and a 324-bunch. A “swap out” injection scheme is required. In order to provide the required kick to injected beam, to minimize the beam loss and residual oscillation of injected beam, and to minimize the perturbation to stored beam during injection, the rise, fall, and flat-top parts of the kicker pulse must be within a 16.9-ns interval. Stripline-type kickers are chosen for both injection and extraction. We developed a prototype kicker that supports a ±15kV differential pulse voltage. We performed high voltage discharge, TDR measurement, high voltage pulse test and beam test of the kicker. We report the final design of the fast kicker and the test results.

APS MBA UPGRADE↗

CLEARING MAGNET DESIGN FOR APS-U

The Advanced Photon Source is in the process of developing an upgrade (APS-U) of the storage ring. The upgrade will be converting the current double bend achromat (DBA) lattice to a multi-bend achromat (MBA) lattice. In addition, the storage ring will be operated at 6 GeV and 200 mA with regular swap-out injection to keep the stored beam current constant [1]. The swap-out injection will take place with beamline shutters open. For radiation safety to ensure that no electrons can exit the storage ring, a passive method of protecting the beamline and containing the electrons inside the storage ring is proposed. A clearing magnet will be located in all beamline front ends inside the storage ring tunnel. This article will discuss the features and design of the clearing magnet scheme for APS-U.

Abliz, M.↗

Performance Test of the Next Generation X-Ray Beam Position Monitor System for The APS Upgrade

The Advanced Photon Source is developing its next major upgrade (APS-U) based on the multi-bend achromat lattice. Improved beam stability is critical for the upgrade and will require keeping short-time beam angle change below 0.25 µrad and long-term angle drift below 0.6 µrad. A reliable white x-ray beam diagnostic system in the front end will be a key part of the planned beam stabilization system. This system includes an x-ray beam position monitor (XBPM) based on x-ray fluorescence (XRF) from two specially designed GlidCop A-15 absorbers, a second XBPM using XRF photons from the Exit Mask, and two white beam intensity monitors using XRF from the photon shutter and Compton-scattered photons from the front end beryllium window or a retractable diamond film in windowless front ends. We present orbit stability data for the first XBPM used in the feedback control during user operations, as well as test data from the second XBPM and the intensity monitors. They demonstrate that the XBPM system meets APS-U beam stability requirements.

Yang, B.↗

Conceptual design of front ends for the advanced photon source multi-bend achromats upgrade

The proposed Advanced Photon Source (APS) upgrade from a double-bend achromats (DBA) to multi-bend achromats (MBA) lattice with ring energy change from 7 GeV to 6 GeV and beam current from 100 mA to 200 mA poses new challenges for front ends. All front ends must be upgraded to fulfill the following requirements: 1) handle the high heat load from two insertion devices in either inline or canted configuration, 2) include a clearing magnet in the front end to deflect and dump any electrons in case the electrons escape from the storage ring during swap-out injection with the safety shutters open, 3) incorporate the next generation x-ray beam position monitors (XBPMs) into the front end to meet the new stringent beam stability requirements. This paper presents the evaluation of the existing APS front ends and standardizes the insertion device (ID) front ends into two types: one for the single beam and one for the canted beams. The conceptual design of high heat load front end (HHLFE) and canted undulator front end (CUFE) for APS MBA upgrade is presented.

43 PARTICLE ACCELERATORS↗

FAST INJECTION SYSTEM R&D FOR THE APS UPGRADE

The MBA upgrade for the APS will operate with bunch swap out and on axis injection. The planned 324 bunch fill pattern places difficult demands on the injection and extraction kickers. The present concept uses dual stripline kickers driven by high Voltage pulsers. Minimizing perturbation on adjacent bunches requires very fast rise and fall times with relatively narrow ~20 nsec, 15 kV pulses. To achieve these requirements we have initiated a multifaceted R&D program. The R&D includes the HV pulser, stripline kicker and HV feedthrough. We have purchased a commercial dual channel HV pulser and are evaluating its performance and reliability. In addition, we are investigating the feasibility of using nonlinear ferrite loaded coaxial cables (shockwave transmission line) to sharpen the leading and trailing edges of high voltage pulses. We are also developing a prototype kicker and high voltage feedthrough. The requirements for injection and extraction, progress on prototype development and results of our HV pulser investigations will be reported.

Lenkszus, F.↗