Annual MSGP No Exposure Exclusion Training for TA-9-28, TA-14-23, TA-15-313, and TA-22-52 [Slides]
Abstract not provided.
Engineering topics
Publications and source records attributed to Wheeler, Holly Lynn.
Abstract not provided.
Most construction projects at LANL are subject to a EPA regulated storm water discharge permit (NPDES Construction General Permit). Each identified non-compliance is a regulatory liability to both the subcontractor & Triad.
No abstract provided.
This report discusses training surrounding the multi-sector general permit for industrial storm water.
Stormwater Pollution Prevention Plan for the Heavy Equipment (Motor Pool) Shop Areas.
This report describes the Stormwater Pollution Prevention plan for the LANL, Salvage and Warehouse Area.
This report is a description of the storm water pollution prevention plan for LANL's power and steam plant.
This report describes a pollution prevention plan for the LANL power and steam plant in area 3.
No abstract provided