The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

BEAM DYNAMICS CHALLENGES IN THE DESIGN OF THE ELECTRON-ION COLLIDER

The Electron-Ion Collider (EIC), presently under construction at Brookhaven National Laboratory, will collide polarized high-energy electron beams with hadron beams, achieving luminosities up to 1 × 1034 cm¿2 s¿1 in the center-of-mass energy range of 20-140 GeV. To achieve such high luminosity, we adopt high bunch intensities for both beams, small and flat transverse beam sizes at the interaction point (IP), a large crossing angle of 25 mrad, and a novel strong hadron cooling in the Hadron Storage Ring (HSR) to counteract intra-beam scattering (IBS) at the collision energy. In this talk, we will review the beam dynamics challenges in the design of the EIC, particularly the single-particle dynamic aperture, polarization maintenance, beam-beam interaction, impedance budget and instabilities. We will also briefly mention some technical challenges associated with beam dynamics, such as strong hadron cooling, multipoles and noises of crab cavities, power supply current ripples, and the vacuum upgrade to existing beam pipes of the Hadron Storage Ring of the EIC.

Luo, Y.↗

Lattice Design of the EIC Electron Storage Ring for Energies Down to 5 GeV

The Electron-Ion Collider (EIC) at Brookhaven National Laboratory will feature an electron storage ring that will circulate polarized beams with energies up to 18 GeV. Recently a study has been undertaken to extend the minimum energy from 6 GeV to 5 GeV. As the solenoid-based spin rotators around the interaction point require specific bending angles that depend on the energy range, this change results in major changes to the geometry. Moreover, avoiding interference of the electron beamline with the other beamlines in the tunnel, as well as with the tunnel walls, is a formidable challenge, especially at the location of the large-diameter superconducting solenoids. In this contribution, the details of the modified spin rotators, geometrical layout, and optics of the revised lattice are presented.

43 PARTICLE ACCELERATORS↗

Task Force Report: ESR Linear Lattice Design

A new layout and optics for the Electron Storage Ring (ESR) have been produced with revised spin rotators in IRs 6 and 8, a redesign of IR10, and a new geometric layout for the ring. In this report, the efforts to produce this lattice are documented, including the motivation for design decisions. This new lattice, version 5.5, will be used as the baseline for future studies.

43 PARTICLE ACCELERATORS↗

Emittance and lifetime measurement with damping wigglers

National Synchrotron Light Source II (NSLS-II) is a new third-generation storage ring light source at Brookhaven National Laboratory. The storage ring design calls for small horizontal emittance (<1 nm-rad) and diffraction-limited vertical emittance at 12 keV (8 pm-rad). Achieving low value of the beam size will enable novel user experiments with nm-range spatial and meV-energy resolution. The high-brightness NSLS-II lattice has been realized by implementing 30-cell double bend achromatic cells producing the horizontal emittance of 2 nm rad and then halving it further by using several Damping Wigglers (DWs). This paper is focused on characterization of the DW effects in the storage ring performance, namely, on reduction of the beam emittance, and corresponding changes in the energy spread and beam lifetime. The relevant beam parameters have been measured by the X-ray pinhole camera, beam position monitors, beam filling pattern monitor, and current transformers. In this paper, we compare the measured results of the beam performance with analytic estimates for the complement of the 3 DWs installed at the NSLS-II.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Report of the eRHIC Ring-Ring Working Group

This report evaluates the ring-ring option for eRHIC as a lower risk alternative to the linac-ring option. The reduced risk goes along with a reduced initial luminosity performance. However, a luminosity upgrade path is kept open. This upgrade path consists of two branches, with the ultimate upgrade being either a ring-ring or a linac-ring scheme. The linac-ring upgrade could be almost identical to the proposed linac-ring scheme, which is based on an ERL in the RHIC tunnel. This linac-ring version has been studied in great detail over the past ten years, and its significant risks are known. On the other hand, no detailed work on an ultimate performance ring-ring scenario has been performed yet, other than the development of a consistent parameter set. Pursuing the ring-ring upgrade path introduces high risks and requires significant design work that is beyond the scope of this report.

43 PARTICLE ACCELERATORS↗

Commissioning of NSLS-II

NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 10 22 photons s -1 mm -2 mrad -2 (0.1%BW) -1 . It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

43 PARTICLE ACCELERATORS↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.