Search NASA⌕ Search

Engineering topics

William Bryan

Publications and source records attributed to William Bryan.

NASA’s Space Launch System Successfully Launches Artemis I Mission and Hardware Progress Continues for Next Artemis Missions

NASA’s Artemis I mission will be the first flight of the agency’s Space Launch System (SLS) rocket. It will launch an uncrewed Orion spacecraft to the Moon, where it will enter a highly elliptical retrograde orbit. In 2022, final tests, checkouts, and preparations were on schedule to be completed, including the vital wet dress rehearsal (WDR) at Kennedy Space Center’s (KSC) Launch Complex 39B. Following successful completion of WDR, which is expected in summer 2022, the Artemis I launch vehicle will be returned to the Vehicle Assembly Building (VAB) at KSC where it will be prepared for launch. Important data were collected during launch and will be shared as applicable. While the Artemis I hardware and mission took center stage in 2022, significant progress was made on hardware and software for future Artemis missions, including for the first crewed launch and the following SLS Block 1B and Block 2 variants of the rocket.

John Honeycutt↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

The Artemis era of human space exploration beyond low Earth orbit launched at 1:47 a.m. EST on November 16, 2022. Artemis I was the first integrated flight of the agency’s new super heavy-lift rocket, the Space Launch System (SLS), and the next-generation spacecraft for astronauts, Orion. The mission sent an uncrewed Orion spacecraft into a distant retrograde orbit about the Moon. During the 25-day mission, NASA collected valuable data on the performance of the launch vehicle and crew spacecraft and information on the deep space environment where crews will soon operate. Orion splashed down approximately 80 miles off the coast of Baja, California, at the conclusion of the mission December 11. This paper will provide a summary of the launch campaign from vehicle integration and testing through completion of the upper stage phase with primary emphasis on SLS. It will also discuss highlights of progress on manufacturing and testing of SLS hardware and software for upcoming Artemis missions.

John Honeycutt↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.

John Honeycutt↗

NASA’s Space Launch System: Comprehensive Test Program Leads to Mission Success during Artemis I Flight Test

NASA’s SLS (Space Launch System) rocket had a successful first launch on Nov. 16, 2022, sending an uncrewed Orion spacecraft to the Moon on the agency’s Artemis I mission. Ten 6U CubeSats were also deployed from SLS during the mission. Orbital insertion parameters, including insertion velocity and altitude, were within hundredths and tenths of a percent from predicted values, corroborating data collected from the individual elements that showed similar performance accuracy. While launch remains the main test – and Artemis I was a true test flight – to collect data, confirm and refine computer models, and validate hardware test data, multiple test programs led up to the first flight and enabled the historic launch. Additionally, SLS was designed from the beginning to be a crew-rated launch vehicle, and teams put the astronauts who will fly on it at the forefront of the development process. This paper and presentation will cover the SLS design and development programs that led to the successful Artemis I mission, and which have set the stage to send the first astronauts back to cislunar space since the Apollo 17 crew in 1972.

John Honeycutt↗

Comprehensive Test Program of NASA's Space Launch System Rocket Leads to Successful Artemis Mission

NASA’s SLS (Space Launch System) rocket had a successful first launch on Nov. 16, 2022, sending an uncrewed Orion spacecraft to the Moon on the agency’s Artemis I mission. Ten 6U CubeSats were also deployed from SLS during the mission. Orbital insertion parameters, including insertion velocity and altitude, were within hundredths and tenths of a percent from predicted values, corroborating data collected from the individual elements that showed similar performance accuracy. While launch remains the main test – and Artemis I was a true test flight – to collect data, confirm and refine computer models, and validate hardware test data, multiple test programs led up to the first flight and enabled the historic launch. Additionally, SLS was designed from the beginning to be a crew-rated launch vehicle, and teams put the astronauts who will fly on it at the forefront of the development process. This paper and presentation will cover the SLS design and development programs that led to the successful Artemis I mission, and which have set the stage to send the first astronauts back to cislunar space since the Apollo 17 crew in 1972.

John Honeycutt↗

NASA’s Space Launch System: Powering Artemis and Enabling Discovery

The debut launch of NASA’s super-heavy lift SLS (Space Launch System) rocket in November 2022 opened a new era of deep space exploration. Called the Artemis I mission, the launch sent an uncrewed Orion spacecraft more than 268,000 miles from Earth into a distant retrograde orbit (DRO) about the Moon, before splashing down in the Pacific Ocean 25 days later. While the mission was critical for multiple reasons to NASA’s Artemis campaign, the data collected during the first launch of SLS was vital to understanding how the launch vehicle performs in the flight environment. The test flight provided real-world data to ground and improve models, on-ground testing, and vehicle performance. Data returned show a nominal launch, with many parameters accurate to pre-flight predictions to within tenths of a percent. Equipped with the data, the SLS team is readying the Artemis II vehicle. Beginning with the fourth flight, SLS variants will have multiple upgrades, which increase the capability of the rocket to enable the nation’s most ambitious missions of returning astronauts to the Moon and lunar vicinity. Current hardware progress, as well as Artemis I flight data, will be provided. Additionally, the test programs that enabled the successful first flight will be discussed.

John Honeycutt↗