Search NASA⌕ Search

Engineering topics

Williamson, B.

Publications and source records attributed to Williamson, B..

U.S. Efforts in Support of Examinations at Fukushima Daiichi - November 2025 Meeting Notes

Fifteen years have passed since the March 11, 2011, the Great East Japan Earthquake (GEJE) triggered a tsunami that inundated the Fukushima Daiichi Nuclear Power Station (Daiichi or 1F) and led to severe accidents in multiple units at the plant. During these fifteen years since these events, Daiichi forensics examinations and evaluations have revealed many insights for enhancing the safety of nuclear power plants worldwide. However, uncertainties remain regarding the events after the GEJE. Additional Daiichi forensics information is required to inform future Decontamination and Decommissioning (D&D) activi- ties conducted by the plant owner, Tokyo Electric Power Company Holdings, Incorporated (TEPCO Hold- ings). This forensics information also has important implications for the safety and operation of U.S. commercial nuclear power plants. A collaborative U.S. and Japanese effort, which includes approximately 50 experts in reactor safety and plant operations, was initiated in 2014 by the Department of Energy Office of Nuclear Energy (U.S. DOE-NE) to identify Daiichi examination needs and evaluate recent Daiichi examination data to address these needs. This collaborative effort, which is beneficial to the U.S. and Japan, continues as Japan moves forward with D&D activities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi- November 2020 Meeting Notes with Updated Information Requests

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2021 (FY2021) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Since its inception, annual reports were issued that document significant safety insights being obtained in areas of special emphasis: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. A key aspect of prior U.S. efforts, the updated list of information requests, is included in this FY2021 report to ensure that they are transmitted to organizations within Japan. This report also continues to emphasize how information obtained from the affected reactors at Daiichi has been and will continue to be used to update severe accident management strategies and reduce uncertainties in systems analysis code models. In addition, recommendations are included that would expand the use of this information to provide insights regarding maintenance, radiation protection, design, and siting activities for existing and new reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experimental study of extended timescale dynamics of a plasma wakefield driven by a self-modulated proton bunch

Plasma wakefield dynamics over timescales up to 800 ps, approximately 100 plasma periods, are studied experimentally at the Advanced Wakefield Experiment (AWAKE). The development of the longitudinal wakefield amplitude driven by a self-modulated proton bunch is measured using the external injection of witness electrons that sample the fields. In simulation, resonant excitation of the wakefield causes plasma electron trajectory crossing, resulting in the development of a potential outside the plasma boundary as electrons are transversely ejected. Trends consistent with the presence of this potential are experimentally measured and their dependence on wakefield amplitude are studied via seed laser timing scans and electron injection delay scans.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Proton Bunch Self-Modulation in Plasma with Density Gradient

We study experimentally the effect of linear plasma density gradients on the self-modulation of a 400 GeV proton bunch. Results show that a positive or negative gradient increases or decreases the number of microbunches and the relative charge per microbunch observed after 10 m of plasma. The measured modulation frequency also increases or decreases. With the largest positive gradient we observe two frequencies in the modulation power spectrum. Results are consistent with changes in wakefields’ phase velocity due to plasma density gradients adding to the slow wakefields’ phase velocity during self-modulation growth predicted by linear theory.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi: 2019 Evaluations

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include Fiscal Year 2019 (FY2019) information, summarizes results from a U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Each year, annual reports are issued that document significant safety insights being obtained in areas of special emphasis. For FY2019, the areas emphasized by the expert panel include component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. In addition, the process established by this U.S. effort provides an example that Japan may wish to implement in future international efforts to support D&D. As emphasized in this FY2019 report, important insights are being gained from examinations of the affected units at Daiichi. Although many results from prior years have been moved to appendices, key areas of interest are highlighted in the main document. For example, larger intact components and fuel containing materials observed on the floor of the primary containment and retained on ex-vessel structures continue to be emphasized because of insights that may be gained with respect to vessel failure and ex-vessel interactions with structures and concrete. In addition, the main report presents insights gained by focused evaluations of plant data because of potential use of systems and components during severe accident conditions and alternate perspectives regarding accident progression that may be inferred from such data. The report also illustrates how systems analysis codes can be applied to reduce uncertainties about the progression of events at Daiichi and how practical insights obtained from Daiichi can be used to enhance radiation safety for the existing fleet. Recent and planned updates to systems analysis codes are also discussed. As in prior years, this report contains an appendix with a list of examination needs that was updated after U.S. experts reviewed recently obtained information from Daiichi. Additional details for higher priority, near-term, examination activities are also provided. This report also includes an appendix with a description of a website that was developed to assist U.S. experts by providing information in an archived retrievable location.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Proton-driven plasma wakefield acceleration in AWAKE

In this paper, we briefly summarize the experiments performed during the first Run of the Advanced Wakefield Experiment, AWAKE, at CERN (European Organization for Nuclear Research). The final goal of AWAKE Run 1 (2013–2018) was to demonstrate that 10–20 MeV electrons can be accelerated to GeV-energies in a plasma wakefield driven by a highly-relativistic self-modulated proton bunch. We describe the experiment, outline the measurement concept and present first results. Lastly, we outline our plans for the future.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Acceleration of electrons in the plasma wakefield of a proton bunch

High-energy particle accelerators have been crucial in providing a deeper understanding of fundamental particles and the forces that govern their interactions. To increase the energy of the particles or to reduce the size of the accelerator, new acceleration schemes need to be developed. Plasma wakefield acceleration, in which the electrons in a plasma are excited, leading to strong electric fields (so called ‘wakefields’), is one such promising acceleration technique. Experiments have shown that an intense laser pulse or electron bunch traversing a plasma can drive electric fields of tens of gigavolts per metre and above—well beyond those achieved in conventional radio-frequency accelerators (about 0.1 gigavolt per metre). However, the low stored energy of laser pulses and electron bunches means that multiple acceleration stages are needed to reach very high particle energies. The use of proton bunches is compelling because they have the potential to drive wakefields and to accelerate electrons to high energy in a single acceleration stage. Long, thin proton bunches can be used because they undergo a process called self-modulation, a particle–plasma interaction that splits the bunch longitudinally into a series of high-density microbunches, which then act resonantly to create large wakefields. The Advanced Wakefield (AWAKE) experiment at CERN uses high-intensity proton bunches—in which each proton has an energy of 400 gigaelectronvolts, resulting in a total bunch energy of 19 kilojoules—to drive a wakefield in a ten-metre-long plasma. Electron bunches are then injected into this wakefield. Here we present measurements of electrons accelerated up to two gigaelectronvolts at the AWAKE experiment, in a demonstration of proton-driven plasma wakefield acceleration. Measurements were conducted under various plasma conditions and the acceleration was found to be consistent and reliable. The potential for this scheme to produce very high-energy electron bunches in a single accelerating stage means that our results are an important step towards the development of future high-energy particle accelerators.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

US Efforts in Support of Examinations at Fukushima Daiichi – 2016 Evaluations

Although it is clear that the accident signatures from each unit at the Fukushima Daiichi Nuclear Power Station (NPS) [Daiichi] differ, much is not known about the end-state of core materials within these units. Some of this uncertainty can be attributed to a lack of information related to cooling system operation and cooling water injection. There is also uncertainty in our understanding of phenomena affecting: a) in-vessel core damage progression during severe accidents in boiling water reactors (BWRs), and b) accident progression after vessel failure (ex-vessel progression) for BWRs and Pressurized Water Reactors (PWRs). These uncertainties arise due to limited full scale prototypic data. Similar to what occurred after the accident at Three Mile Island Unit 2, these Daiichi units offer the international community a means to reduce such uncertainties by obtaining prototypic data from multiple full-scale BWR severe accidents. Information obtained from Daiichi is required to inform Decontamination and Decommissioning activities, improving the ability of the Tokyo Electric Power Company Holdings (TEPCO) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document reports recent results from the US Forensics Effort to use information obtained by TEPCO to enhance the safety of existing and future nuclear power plant designs. This Forensics Effort, which is sponsored by the Reactor Safety Technologies Pathway of the Department of Energy Office of Nuclear Energy Light Water Reactor (LWR) Sustainability Program, consists of a group of US experts in LWR safety and plant operations that have identified examination needs and are evaluating TEPCO information from Daiichi that address these needs. Examples presented in this report demonstrate that significant safety insights are being obtained in the areas of component performance, fission product release and transport, debris end-state location, and combustible gas generation and transport. In addition to reducing uncertainties related to severe accident modeling progression, these insights are being used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, reduced uncertainties in modeling the events at Daiichi will improve the realism of reactor safety evaluations and inform future D&D activities by improving the capability for characterizing potential hazards to workers involved with cleanup activities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Space Shuttle astrodynamical constants

Basic space shuttle astrodynamic constants are reported for use in mission planning and construction of ground and onboard software input loads. The data included here are provided to facilitate the use of consistent numerical values throughout the project.

Cockrell, B. F.↗