Search NASA⌕ Search

Engineering topics

Willms, R Scott

Publications and source records attributed to Willms, R Scott.

Testing of a 7-tube palladium membrane reactor for potential use in TEP

A Palladium Membrane Reactor (PMR) consists of a palladium/silver membrane permeator filled with catalyst (catalyst may be inside or outside the membrane tubes). The PMR is designed to recover tritium from the methane, water, and other impurities present in fusion reactor effluent. A key feature of a PMR is that the total hydrogen isotope content of a stream is significantly reduced as (1) methane-steam reforming and/or water-gas shift reactions proceed on the catalyst bed and (2) hydrogen isotopes are removed via permeation through the membrane. With a PMR design matched to processing requirements, nearly complete hydrogen isotope removals can be achieved. A 3-tube PMR study was recently completed. From the results presented in this study, it was possible to conclude that a PMR is appropriate for TEP, perforated metal tube protectors function well, platinum on aluminum (PtA) catalyst performs the best, conditioning with air is probably required to properly condition the Pd/Ag tubes, and that CO/CO{sub 2} ratios maybe an indicator of coking. The 3-tube PMR had a permeator membrane area of 0.0247 m{sup 2} and a catalyst volume to membrane area ratio of 4.63 cc/cm{sup 2} (with the catalyst on the outside of the membrane tubes and the catalyst only covering the membrane tube length). A PMR for TEP will require a larger membrane area (perhaps 0.35 m{sup 2}). With this in mind, an intermediate sized PMR was constructed. This PMR has 7 permeator tubes and a total membrane area of 0.0851 m{sup 2}. The catalyst volume to membrane area ratio for the 7-tube PMR was 5.18 cc/cm{sup 2}. The total membrane area of the 7-tube PMR (0.0851 m{sup 2}) is 3.45 times larger than total membrane area of the 3-tube PMR (0.0247 m{sup 2}). The following objectives were identified for the 7-tube PMR tests: (1) Refine test measurements, especially humidity and flow; (2) Refine maintenance procedures for Pd/Ag tube conditioning; (3) Evaluate baseline PMR operating conditions; (4) Determine PMR scaling method; (5) Evaluate PMR with realistic feed compositions; (6) Evaluate PMR performance with varying permeate pressures; (7) Study coking-related issues; and (8) Identify any unexpected behavior that may require further investigation (used to study transient behavior). This report presents the tests results defined by these objectives.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

TEP R&D

No abstract prepared.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

IS-321-312-001 TEP-to-HTEP manifold interface sheet

The Tokamak Exhaust Processing System (TEP) receives hydrogen-like and air-like gas streams from the High Tritium Exhaust Processing (HTEP) manifold. Gases from the torus roughing pump are pumped into the HTEP manifold before entering TEP. This interface sheet describes the TEP-HTEP material stream interface, both the physical elements that make up the interface as well as the gas streams that will flow through the interface. The functions of this interface are to: Provide a physical connection for the transport of hydrogen-like and air-like gases from the HTEP manifold to TEP. Provide seals to prevent the unncessary release of tritium to the surrounding environment. Provide valves that can be actuated to stop or prevent the flow of gas into TEP.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

System interfaces control document for the Tokamak exhaust processing system PBS 3.2.1

The Tokamak Exhaust Processing System (TEP) removes tritium from highly tritiated gas streams and returns it back to the fuel system. The largest feed streams originate from the torus, but others arrive from systems throughout the tritium plant. Tritium in the form of free hydrogen (i.e., DT, HT) is separated by Pd-Ag permeators or by cryoadsorption and directed to the Isotope Separation System (ISS). Tritium present in impurities (such as CD{sub 2}T{sub 2} and DTO) is chemically converted to free hydrogen, separated by Pd-Ag membranes, and then sent to ISS. All waste streams are processed by the Detritiation System (DS) prior to venting to the atmosphere. The stream received from Helium Glow Discharge Cleaning (GDC) is returned to GDC after processing. TEP is also designed to accommodate a Tritium Plant (TP) standby mode of operation whereby gases received from fuelling are processed by TEP and returned to SDS. This S-ICD describes all process interfaces for TEP and contains tables to control their progressive definition.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗