Search NASA⌕ Search

Engineering topics

Wilson, John E.

Publications and source records attributed to Wilson, John E..

Sampling and Analysis Plan for LSL2 Underground Storage Tank Evaluation of PFAS in Soil: Protection of Groundwater

This SAP gathers all pertinent information relevant to the sampling and analysis of soil at the removal site for a former 10,000-gallon UST and reference sites in the vicinity of the excavation site. Data Quality Objectives establishes the process and steps for the acquisition of data. Data Flow Diagram establishes the decisions and next steps. Quality Assurance Project Plan establishes the quality requirements for data collection, including planning, implementation, and assessment of sampling, field measurements, and laboratory analysis. The work is being completed for DOE-SC Pacific Northwest Site Office.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visual Sample Plan Version 7.0 User's Guide

User's guide for VSP 7.0 This user's guide describes Visual Sample Plan (VSP) Version 7.0 and provides instructions for using the software. VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 7.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sites suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (XP, Vista, Windows 7, and Windows 8). Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem/rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for unexploded ordnance (UXO) identification.

97 MATHEMATICS AND COMPUTING↗

Recommendations for Safe Separation Distances from the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB) Using a Heat-Flux-Based Analytical Approach (Abridged)

The NASA Engineering and Safety Center (NESC) was requested to provide computational modeling to support the establishment of a safe separation distance surrounding the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB). The two major objectives of the study were 1) establish a methodology based on thermal flux to determine safe separation distances from the Kennedy Space Center's (KSC's) Vehicle Assembly Building (VAB) with large numbers of solid propellant boosters containing hazard division 1.3 classification propellants, in case of inadvertent ignition; and 2) apply this methodology to the consideration of housing eight 5-segment solid propellant boosters in the VAB. The results of the study are contained in this report.

Cragg, Clinton H.↗