Search NASA⌕ Search

Engineering topics

Wilson, K

Publications and source records attributed to Wilson, K.

SU-E-T-452: Identifying Inefficiencies in Radiation Oncology Workflow and Prioritizing Solutions for Process Improvement and Patient Safety

Purpose: Successful radiation therapy requires multi-step processes susceptible to unnecessary delays that can negatively impact clinic workflow, patient satisfaction, and safety. This project applied process improvement tools to assess workflow bottlenecks and identify solutions to barriers for effective implementation. Methods: We utilized the DMAIC (define, measure, analyze, improve, control) methodology, limiting our scope to the treatment planning process. From May through December of 2014, times and dates of each step from simulation to treatment were recorded for 507 cases. A value-stream map created from this dataset directed our selection of outcome measures (Y metrics). Critical goals (X metrics) that would accomplish the Y metrics were identified. Barriers to actions were binned into control-impact matrices, in order to stratify them into four groups: in/out of control and high/low impact. Solutions to each barrier were then categorized into benefit-effort matries to identify those of high benefit and low effort. Results: For 507 cases, the mean time from simulation to treatment was 235 total hours. The mean process and wait time were 60 and 132 hours, respectively. The Y metric was to increase the ratio of all non-emergent plans completed the business day prior to treatment from 47% to 75%. Project X metrics included increasing the number of IMRT QAs completed at least 24 hours prior to treatment from 19% to 80% and the number of non-IMRT plans approved at least 24 hours prior to treatment from 33% to 80%. Intervals from simulation to target contour and from initial plan completion to plan approval were identified as periods that could benefit from intervention. Barriers to actions were binned into control-impact matrices and solutions by benefit-effort matrices. Conclusion: The DMAIC method can be successfully applied in radiation therapy clinics to identify inefficiencies and prioritize solutions for the highest impact.

60 APPLIED LIFE SCIENCES↗

The effect of low levels of dopants upon the formation and properties of beta-phase molybdenum nitride

The addition of 1 wt% Pd, Au, Ni and Cu dopants has been demonstrated to strongly alter the morphology of beta-phase molybdenum nitride prepared by treatment of MoO{sub 3} with a 3/1 H{sub 2}/N{sub 2} mixture at 750 deg. C. Furthermore, the addition of Pd significantly enhances the surface area and the formation of the nitride phase. It is proposed that the facile formation of molybdenum bronzes in this system is important in this respect. The dopants have also been observed to modify the denitridation characteristics of the beta-phase, with an overall reduction of the proportion of NH{sub 3} formed upon using a 3/1 H{sub 2}/Ar mixture with respect to the undoped sample. - Graphical abstract: Low levels of Pd, Au, Ni and Cu dopant have significant effects upon the morphology, formation and dentitridation characteristics of beta-phase molybdenum nitride.

36 MATERIALS SCIENCE↗

Environmental Monitoring Plan, Revision 5

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

54 ENVIRONMENTAL SCIENCES↗

Environmental Report 2008

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2008 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2008: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL's Environmental Protection Department. Monitoring data were obtained through the combined efforts of the Environmental Protection Department; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiation Laboratory; and the Hazards Control Department.

54 ENVIRONMENTAL SCIENCES↗

NSLS II Vacuum System

National Synchrotron Light Source II, being constructed at Brookhaven, is a 3-GeV, 500 mA, 3rd generation synchrotron radiation facility with ultra low emittance electron beams. The storage ring vacuum system has a circumference of 792 m and consists of over 250 vacuum chambers with a simulated average operating pressure of less than 1 x 10{sup -9} mbar. A summary of the update design of the vacuum system including girder supports of the chambers, gauges, vacuum pumps, bellows, beam position monitors and simulation of the average pressure will be shown. A brief description of the techniques and procedures for cleaning and mounting the chambers are given.

42 ENGINEERING↗